← RUBY MINE

RUBY MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F036E06

    0.0 on-site hours reported

  2. Regular Safety and Health Inspection

    inspectionRecord F022F5E

    13.0 on-site hours reported

  3. Regular Safety and Health Inspection

    inspectionRecord F022F51

    21.5 on-site hours reported

  4. Regular Safety and Health Inspection

    inspectionRecord F022F4B

    8.0 on-site hours reported

  5. Spot Inspection

    inspectionRecord F008C43

    19.0 on-site hours reported

  6. Regular Safety and Health Inspection

    inspectionRecord F022F43

    16.0 on-site hours reported

  7. Testing grounding systems.

    violationRecord 5102911

    30 CFR 57.12028 · $151.00 proposed penalty

  8. Grounding circuit enclosures.

    violationRecord 5102910

    30 CFR 57.12025 · $151.00 proposed penalty

  9. Grounding circuit enclosures.

    violationRecord 5102909

    30 CFR 57.12025 · $151.00 proposed penalty

  10. Stationary grinding machines.

    violationRecord 5102908

    30 CFR 57.14115(b) · $151.00 proposed penalty

  11. Written safety program.

    violationRecord 5102906

    30 CFR 57.23002(a) · $151.00 proposed penalty

  12. Requirement for a HazCom program.

    violationRecord 5102905

    30 CFR 47.31(a) · $151.00 proposed penalty

  13. Legal identity report.

    violationRecord 5102904

    30 CFR 41.20 · $151.00 proposed penalty

  14. Notification of commencement of operations and closing of mines.

    violationRecord 5102903

    30 CFR 57.1000 · $151.00 proposed penalty

  15. Experienced miner training.

    violationRecord 5102901

    30 CFR 48.26(b) · $517.00 proposed penalty

  16. Training plans; time of submission; where filed; information required; time for approval; method for disapproval; commencement of training; approval of instructors.

    violationRecord 5102900

    30 CFR 48.23(a) · $151.00 proposed penalty

  17. Training plans; time of submission; where filed; information required; time for approval; method for disapproval; commencement of training; approval of instructors.

    violationRecord 5102899

    30 CFR 48.23(a)(3) · $151.00 proposed penalty

  18. Records of training.

    violationRecord 5102898

    30 CFR 48.29(a) · $151.00 proposed penalty

  19. Hazard training.

    violationRecord 5102897

    30 CFR 48.31(a) · $320.00 proposed penalty

  20. Training of new miners; minimum courses of instruction; hours of instruction.

    violationRecord 5102896

    30 CFR 48.25(a) · Significant and substantial (S&S) · $407.00 proposed penalty

  21. Regular Safety and Health Inspection

    inspectionRecord F025DA4

    3.8 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.