Permissible electric face equipment; maintenance.
30 CFR 75.503 · $432.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Powered haulage
Days away from work only
Accident narrative
EE stated that while operating the 21SC shuttle car being loaded by the continuous mining machine, the bumper of the CM came in to contact with load end of the shuttle car. When the car operator pulled away, this caused the dump in to be raised slightly then fall suddenly, jarring the car operator resulting in EE's head hitting EE's head on canopy.
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S) · $465.00 proposed penalty
Violation — cited standard not reported
$297.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $959.00 proposed penalty
On-shift examination.
30 CFR 75.362(g)(2)(i) · $151.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · $226.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1) · $465.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $209.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · $465.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $209.00 proposed penalty
Regular Safety and Health Inspection
188.5 on-site hours reported
Spot Inspection
6.5 on-site hours reported
Handling of materials
Days away from work only
Accident narrative
EE was dropping CM cable and water line from a hanger when EE felt pain in EE's left shoulder.
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $151.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $177.00 proposed penalty
Mining methods.
30 CFR 75.203(e)(1) · $209.00 proposed penalty
Mining methods.
30 CFR 75.203(e)(1) · $209.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $226.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $151.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.