← ROAD FORK #52 MINE

ROAD FORK #52 MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Violation — cited standard not reported

    violationRecord 5132641
  2. Preshift examination at fixed intervals.

    violationRecord 5094516

    30 CFR 75.360(f)

  3. Mine ventilation plan; submission and approval.

    violationRecord 5134634

    30 CFR 75.370(a)(1) · Significant and substantial (S&S)

  4. Machinery

    accidentRecord 220262600004

    Days away from work only

    Accident narrative

    Employee had finished drilling the hole for the outside primary bolt. As EE began installing the glue, a piece of rock from the roof fell out, striking EE's left shoulder and arm.

  5. Spot Inspections

    inspectionRecord F03604D

    103(i) · 5.0 on-site hours reported

  6. Accumulation of combustible materials.

    violationRecord 5134633

    30 CFR 75.400

  7. Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.

    violationRecord 5134632

    30 CFR 75.1107-1(a)(3)(ii)

  8. Spot Inspections

    inspectionRecord F03604C

    103(i) · 6.5 on-site hours reported

  9. Electric equipment; examination, testing and maintenance.

    violationRecord 5134631

    30 CFR 75.512

  10. Handling of materials

    accidentRecord 220262580012

    Days away from work only

    Accident narrative

    While holding the shield covering the compressor in the air, employee states that the shield slipped from their hand, coming down and smashing their left fingers between shield and motor frame.

  11. Cable fittings; suitability.

    violationRecord 5134630

    30 CFR 75.515

  12. General instructions for completing MSHA Form 7000-1.

    violationRecord 5134629

    30 CFR 50.20-1

  13. Investigation.

    violationRecord 5134628

    30 CFR 50.11(b)

  14. Violation — cited standard not reported

    violationRecord 5134627
  15. Identification check system.

    violationRecord 5134626

    30 CFR 75.1715

  16. Sampling; general and technical requirements.

    violationRecord 5131417

    30 CFR 71.201(d)

  17. Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.

    violationRecord 5096694

    30 CFR 75.1600-2(e)

  18. Permissible electric face equipment; maintenance.

    violationRecord 5096693

    30 CFR 75.503

  19. Methane monitors.

    violationRecord 5096692

    30 CFR 75.342(a)(4)

  20. Permissible electric face equipment; maintenance.

    violationRecord 5096691

    30 CFR 75.503

  21. Roof bolting.

    violationRecord 5096690

    30 CFR 75.204(c)(1)

  22. Spot Inspections

    inspectionRecord F03604B

    103(i) · 4.5 on-site hours reported

  23. Permissible electric face equipment; maintenance.

    violationRecord 5134625

    30 CFR 75.503

  24. Ventilation controls.

    violationRecord 5134624

    30 CFR 75.333(h)

  25. Machinery and equipment; operation and maintenance.

    violationRecord 5134623

    30 CFR 75.1725(c) · Significant and substantial (S&S)

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.