ROAD FORK #52 MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Accumulation of combustible materials.
30 CFR 75.400 · $642.00 proposed penalty
Air quality.
30 CFR 75.321(a)(1) · $504.00 proposed penalty
Verbal Hazard Complaint Inspections
36.0 on-site hours reported
Roof control plan.
30 CFR 75.220(a)(1) · $2,503.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $755.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $2,712.00 proposed penalty
Quantity and location of firefighting equipment.
30 CFR 75.1100-2(e) · $336.00 proposed penalty
Criteria—Haulage; general.
30 CFR 75.1403-10(i)
Preshift examination at fixed intervals.
30 CFR 75.360(a)(1) · $5,574.00 proposed penalty
Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.
30 CFR 75.363(a) · $5,574.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $755.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $755.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $697.00 proposed penalty
Protective clothing; requirements.
30 CFR 75.1720(a) · Significant and substantial (S&S) · $3,736.00 proposed penalty
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
30 CFR 75.1600-2 · $592.00 proposed penalty
Protection of trailing cables.
30 CFR 75.606 · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(b)(3) · $165.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $193.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $2,503.00 proposed penalty
Approval of other fire suppression devices.
30 CFR 75.1107-13(g) · $151.00 proposed penalty
Approval of other fire suppression devices.
30 CFR 75.1107-13(g) · $151.00 proposed penalty
Fall of roof or back
Days away from work only
Accident narrative
Employee stated EE was installing a rib bolt when a piece of drawl rock measuring 32" long X 1" wide X 2" thick fell sticking EE in the face.
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $504.00 proposed penalty
Spot Inspections
103(i) · 6.3 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $504.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.