← ROAD FORK #52 MINE

ROAD FORK #52 MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Roof control plan.

    violationRecord 5091078

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $13,436.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 5090947

    30 CFR 75.400 · $697.00 proposed penalty

  3. Mine ventilation plan; submission and approval.

    violationRecord 5090946

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  4. Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.

    violationRecord 5090945

    30 CFR 75.363(a) · $1,679.00 proposed penalty

  5. Criteria—Haulage; general.

    violationRecord 5090944

    30 CFR 75.1403-10(i) · $1,679.00 proposed penalty

  6. Protection from falls of roof, face and ribs.

    violationRecord 5090835

    30 CFR 75.202(a) · $288.00 proposed penalty

  7. Ventilation controls.

    violationRecord 5090834

    30 CFR 75.333(c)(3) · $151.00 proposed penalty

  8. Spot Inspections

    inspectionRecord F01FF16

    103(i) · 14.0 on-site hours reported

  9. Accumulation of combustible materials.

    violationRecord 5091216

    30 CFR 75.400 · $2,312.00 proposed penalty

  10. Roof control plan.

    violationRecord 5090833

    30 CFR 75.220(a)(1) · $336.00 proposed penalty

  11. Protection from falls of roof, face and ribs.

    violationRecord 5090832

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  12. Maintenance of incombustible content of rock dust.

    violationRecord 5096819

    30 CFR 75.403 · $177.00 proposed penalty

  13. Maintenance of incombustible content of rock dust.

    violationRecord 5096818

    30 CFR 75.403 · $177.00 proposed penalty

  14. Maintenance of incombustible content of rock dust.

    violationRecord 5096809

    30 CFR 75.403 · $177.00 proposed penalty

  15. Electric equipment; examination, testing and maintenance.

    violationRecord 5096817

    30 CFR 75.512 · $1,126.00 proposed penalty

  16. Roof control plan.

    violationRecord 5096816

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $4,383.00 proposed penalty

  17. Power wires and cables; insulation and protection.

    violationRecord 5090831

    30 CFR 75.517 · Significant and substantial (S&S) · $5,144.00 proposed penalty

  18. Electric equipment; examination, testing and maintenance.

    violationRecord 5096815

    30 CFR 75.512 · Significant and substantial (S&S) · $32,395.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 5096814

    30 CFR 75.370(a)(1) · $1,320.00 proposed penalty

  20. Automatic emergency-parking brakes.

    violationRecord 5096813

    30 CFR 75.523-3(b)(2) · Significant and substantial (S&S) · $18,504.00 proposed penalty

  21. Machinery and equipment; operation and maintenance.

    violationRecord 5096812

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $8,315.00 proposed penalty

  22. Protection from falls of roof, face and ribs.

    violationRecord 5090830

    30 CFR 75.202(a) · $432.00 proposed penalty

  23. Spot Inspections

    inspectionRecord F0107DC

    103(i) · 15.8 on-site hours reported

  24. Electric equipment; examination, testing and maintenance.

    violationRecord 5096811

    30 CFR 75.512 · $267.00 proposed penalty

  25. Methane monitors.

    violationRecord 5096810

    30 CFR 75.342(a)(4) · $366.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.