River Road safety activity
MSHA violations, accident reports and inspections.
Safety activity
Compliance Follow-up Inspection
1.8 on-site hours reported
First aid.
30 CFR 56.18010
Examination of working places.
30 CFR 56.18002(a) · Significant and substantial (S&S)
Testing grounding systems.
30 CFR 56.12028
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
30 CFR 50.30(a)
Annual refresher training.
30 CFR 46.8(a)(2)
Regular Safety and Health Inspection
16.0 on-site hours reported
Annual refresher training.
30 CFR 46.8(a)(2)
Securing gas cylinders.
30 CFR 56.16005
Stacking and storage of materials.
30 CFR 56.16001
Electrical conductors.
30 CFR 56.12004
Protection of gas cylinder valves.
30 CFR 56.16006
Securing gas cylinders.
30 CFR 56.16005
Inspection.
30 CFR 56.4201(a)(2)
Safety defects; examination, correction and records.
30 CFR 56.14100(b) · Significant and substantial (S&S)
Parking procedures for unattended equipment.
30 CFR 56.14207 · Significant and substantial (S&S)
Examination of working places.
30 CFR 56.18002(a) · Significant and substantial (S&S) · $165.00 proposed penalty
Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.
30 CFR 50.30(a) · $151.00 proposed penalty
Brakes.
30 CFR 56.14101(a)(2) · $151.00 proposed penalty
Regular Safety and Health Inspection
9.3 on-site hours reported
Splices and repairs of power cables.
30 CFR 56.12013 · $151.00 proposed penalty
Berms or guardrails.
30 CFR 56.9300(b) · $151.00 proposed penalty
Construction and maintenance of guards.
30 CFR 56.14112(b) · Significant and substantial (S&S) · $165.00 proposed penalty
Construction and maintenance of guards.
30 CFR 56.14112(b) · Significant and substantial (S&S) · $165.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.