Right Fork Splint safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Spot Inspection

    inspectionRecord F021187

    2.0 on-site hours reported

  2. Regular Safety and Health Inspection

    inspectionRecord F01F075

    2.0 on-site hours reported

  3. Spot Inspection

    inspectionRecord F005490

    5.5 on-site hours reported

  4. Loading and haulage equipment; operation.

    violationRecord 5080425

    30 CFR 77.1607(i) · $151.00 proposed penalty

  5. Highwalls, pits and spoil banks; plans.

    violationRecord 5080410

    30 CFR 77.1000 · $151.00 proposed penalty

  6. Protection of trailing cables.

    violationRecord 5080409

    30 CFR 77.604 · $151.00 proposed penalty

  7. Highwalls, pits and spoil banks; plans.

    violationRecord 9778935

    30 CFR 77.1000 · $151.00 proposed penalty

  8. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9778934

    30 CFR 77.1606(c) · $151.00 proposed penalty

  9. Regular Safety and Health Inspection

    inspectionRecord F0016A7

    41.0 on-site hours reported

  10. Regular Safety and Health Inspection

    inspectionRecord 6973679

    5.5 on-site hours reported

  11. Loading and haulage equipment; installations.

    violationRecord 9772962

    30 CFR 77.1605(a)

  12. Loading and haulage equipment; installations.

    violationRecord 9772961

    30 CFR 77.1605(a)

  13. Spot Inspection

    inspectionRecord 6973667

    27.0 on-site hours reported

  14. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9821382

    30 CFR 77.1606(c) · $151.00 proposed penalty

  15. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9821381

    30 CFR 77.1606(c) · $151.00 proposed penalty

  16. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9821380

    30 CFR 77.1606(c) · $151.00 proposed penalty

  17. Loading and haulage equipment; installations.

    violationRecord 9821379

    30 CFR 77.1605(a) · $168.00 proposed penalty

  18. Mobile equipment; automatic warning devices.

    violationRecord 9821378

    30 CFR 77.410(a)(1) · $151.00 proposed penalty

  19. Loading and haulage equipment; installations.

    violationRecord 9821377

    30 CFR 77.1605(a) · $168.00 proposed penalty

  20. Highwalls, pits and spoil banks; plans.

    violationRecord 9775451

    30 CFR 77.1000 · $151.00 proposed penalty

  21. Regular Safety and Health Inspection

    inspectionRecord 6973665

    59.3 on-site hours reported

  22. Status change reports.

    violationRecord 7558658

    30 CFR 71.209(a) · $151.00 proposed penalty

  23. Status change reports.

    violationRecord 7558657

    30 CFR 71.209(a) · $151.00 proposed penalty

  24. Examination and maintenance of firefighting equipment.

    violationRecord 7558656

    30 CFR 77.1110 · $151.00 proposed penalty

  25. Loading and haulage equipment; inspection and maintenance.

    violationRecord 7558655

    30 CFR 77.1606(c) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.