Rheems Quarry safety activity
MSHA violations, accident reports and inspections.
Safety activity
Compliance Follow-up Inspection
0.8 on-site hours reported
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S) · $151.00 proposed penalty
Regular Safety and Health Inspection
7.8 on-site hours reported
Correction of hazardous conditions.
30 CFR 56.3200 · $151.00 proposed penalty
Regular Safety and Health Inspection
7.5 on-site hours reported
Construction and maintenance of guards.
30 CFR 56.14112(b) · $151.00 proposed penalty
Handling of materials
Dys awy frm wrk & restrctd act
Accident narrative
Employee was in the process of changing the bucket on the skid loader bucket. During this process the bucket came off of the mounting tab while in the air and the bucket came down on employees right foot
Inspection and cover plates.
30 CFR 56.12032 · $151.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 56.14100(b) · $151.00 proposed penalty
Regular Safety and Health Inspection
17.0 on-site hours reported
Regular Safety and Health Inspection
17.5 on-site hours reported
Access to stationary electrical equipment or switchgear.
30 CFR 56.12019 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.