← Ram Surface Mine No. 1

Ram Surface Mine No. 1 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5133731

    30 CFR 77.1606(c) · $1,320.00 proposed penalty

  2. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5133738

    30 CFR 77.1606(c) · $1,320.00 proposed penalty

  3. Drilling; general.

    violationRecord 5133730

    30 CFR 77.1007(b) · $432.00 proposed penalty

  4. Highwalls, pits and spoil banks; plans.

    violationRecord 5133729

    30 CFR 77.1000 · Significant and substantial (S&S) · $4,749.00 proposed penalty

  5. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5133728

    30 CFR 77.1606(c) · $1,320.00 proposed penalty

  6. Regular Safety and Health Inspection

    inspectionRecord F02293A

    72.3 on-site hours reported

  7. Spot Inspection

    inspectionRecord F02EC7A

    3.8 on-site hours reported

  8. Spot Inspection

    inspectionRecord F004CF6

    1.0 on-site hours reported

  9. Spot Inspection

    inspectionRecord F004CF4

    1.0 on-site hours reported

  10. Verbal Hazard Complaint Inspections

    inspectionRecord F004CF1

    9.5 on-site hours reported

  11. Loading and haulage equipment; installations.

    violationRecord 5186120

    30 CFR 77.1605(d) · $165.00 proposed penalty

  12. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5186119

    30 CFR 77.1606(c) · $592.00 proposed penalty

  13. Loading and haulage equipment; installations.

    violationRecord 5186118

    30 CFR 77.1605(l) · $151.00 proposed penalty

  14. Stripping; loose material.

    violationRecord 5133601

    30 CFR 77.1001 · Significant and substantial (S&S) · $3,448.00 proposed penalty

  15. Stripping; loose material.

    violationRecord 5133600

    30 CFR 77.1001 · Significant and substantial (S&S) · $1,037.00 proposed penalty

  16. Spot Inspection

    inspectionRecord F004CEE

    1.8 on-site hours reported

  17. Highwalls, pits and spoil banks; plans.

    violationRecord 5092303

    30 CFR 77.1000 · $209.00 proposed penalty

  18. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5092302

    30 CFR 77.1606(c) · $151.00 proposed penalty

  19. Loading and haulage equipment; installations.

    violationRecord 5092301

    30 CFR 77.1605(a) · $151.00 proposed penalty

  20. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9837999

    30 CFR 77.1606(c) · $366.00 proposed penalty

  21. Highwalls, pits and spoil banks; plans.

    violationRecord 9837998

    30 CFR 77.1000 · $209.00 proposed penalty

  22. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5092300

    30 CFR 77.1606(c) · $366.00 proposed penalty

  23. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9837997

    30 CFR 77.1606(c) · $366.00 proposed penalty

  24. Loading and haulage equipment; installations.

    violationRecord 9837996

    30 CFR 77.1605(d) · $151.00 proposed penalty

  25. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9837995

    30 CFR 77.1606(c) · $366.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.