  1. Regular Safety and Health Inspection

    inspectionRecord F036E08

    0.0 on-site hours reported

  2. Construction and maintenance of guards.

    violationRecord 5102660

    30 CFR 56.14112(a)(1)

  3. Compliance Follow-up Inspection

    inspectionRecord F012E41

    1.3 on-site hours reported

  4. Regular Safety and Health Inspection

    inspectionRecord F012E3A

    5.5 on-site hours reported

  5. Wall, bank, and slope stability.

    violationRecord 5102150

    30 CFR 56.3130 · $151.00 proposed penalty

  6. Regular Safety and Health Inspection

    inspectionRecord F021E4A

    3.3 on-site hours reported

  7. Verbal Hazard Complaint Inspections

    inspectionRecord F02788E

    1.8 on-site hours reported

  8. Verbal Hazard Complaint Inspections

    inspectionRecord F0299D8

    1.8 on-site hours reported

  9. Regular Safety and Health Inspection

    inspectionRecord F0299B9

    3.3 on-site hours reported

  10. Closure of valves.

    violationRecord 9680802

    30 CFR 56.4603(b) · $151.00 proposed penalty

  11. Compliance Follow-up Inspection

    inspectionRecord F012DEC

    1.5 on-site hours reported

  12. Horns and backup alarms.

    violationRecord 9890077

    30 CFR 56.14132(a) · $151.00 proposed penalty

  13. Horns and backup alarms.

    violationRecord 9890076

    30 CFR 56.14132(a) · $151.00 proposed penalty

  14. Horns and backup alarms.

    violationRecord 9890075

    30 CFR 56.14132(a) · $151.00 proposed penalty

  15. Flying or falling materials.

    violationRecord 9890074

    30 CFR 56.14110 · $151.00 proposed penalty

  16. Regular Safety and Health Inspection

    inspectionRecord F012DE8

    5.3 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.