Pryor Stone #2 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F045B43

    2.5 on-site hours reported

  2. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F03C31F

    2.0 on-site hours reported

  3. Guarding electrical connections and resistor grids.

    violationRecord 5177818

    30 CFR 56.12023 · $151.00 proposed penalty

  4. Air receiver tanks.

    violationRecord 5177817

    30 CFR 56.13011 · $151.00 proposed penalty

  5. Berms or guardrails.

    violationRecord 5177816

    30 CFR 56.9300(b) · $151.00 proposed penalty

  6. Construction and maintenance of guards.

    violationRecord 5177815

    30 CFR 56.14112(b) · $151.00 proposed penalty

  7. Inspection and cover plates.

    violationRecord 5177814

    30 CFR 56.12032 · $151.00 proposed penalty

  8. Moving machine parts.

    violationRecord 5177813

    30 CFR 56.14107(a) · $177.00 proposed penalty

  9. Combustible waste.

    violationRecord 5177812

    30 CFR 56.4104(b) · $151.00 proposed penalty

  10. Requirement for container labels.

    violationRecord 5177811

    30 CFR 47.41(a) · $151.00 proposed penalty

  11. Safety defects; examination, correction and records.

    violationRecord 5177810

    30 CFR 56.14100(a) · Significant and substantial (S&S) · $245.00 proposed penalty

  12. Examination of working places.

    violationRecord 5177809

    30 CFR 56.18002(b) · $151.00 proposed penalty

  13. Construction and maintenance of guards.

    violationRecord 5177808

    30 CFR 56.14112(b) · $151.00 proposed penalty

  14. Safety defects; examination, correction and records.

    violationRecord 5177807

    30 CFR 56.14100(c) · Significant and substantial (S&S) · $366.00 proposed penalty

  15. Horns and backup alarms.

    violationRecord 5177806

    30 CFR 56.14132(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  16. Combustible waste.

    violationRecord 5177805

    30 CFR 56.4104(a) · $151.00 proposed penalty

  17. General requirements.

    violationRecord 5177804

    30 CFR 56.4200(b)(2) · $151.00 proposed penalty

  18. Warning signs.

    violationRecord 5177803

    30 CFR 56.4101 · $151.00 proposed penalty

  19. Moving machine parts.

    violationRecord 5177802

    30 CFR 56.14107(a) · $151.00 proposed penalty

  20. Regular Safety and Health Inspection

    inspectionRecord F03C317

    21.0 on-site hours reported

  21. Verbal Hazard Complaint Inspections

    inspectionRecord F038547

    3.5 on-site hours reported

  22. Moving machine parts.

    violationRecord 5003719

    30 CFR 56.14107(a) · $151.00 proposed penalty

  23. Moving machine parts.

    violationRecord 5003718

    30 CFR 56.14107(a) · $151.00 proposed penalty

  24. Safe access.

    violationRecord 5003717

    30 CFR 56.11001 · Significant and substantial (S&S) · $209.00 proposed penalty

  25. Construction and maintenance of guards.

    violationRecord 5003716

    30 CFR 56.14112(b) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.