← Premium Sandstone Quarry

Premium Sandstone Quarry safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F0367BA

    9.3 on-site hours reported

  2. Correction of hazardous conditions.

    violationRecord 5179202

    30 CFR 56.3200 · $288.00 proposed penalty

  3. Berms or guardrails.

    violationRecord 5179201

    30 CFR 56.9300(a) · $288.00 proposed penalty

  4. Electric substations and liquid storage facilities.

    violationRecord 5176800

    30 CFR 56.4130(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  5. Horns and backup alarms.

    violationRecord 5176799

    30 CFR 56.14132(a) · $193.00 proposed penalty

  6. Safe access.

    violationRecord 5176798

    30 CFR 56.11001 · $193.00 proposed penalty

  7. Berms or guardrails.

    violationRecord 5176797

    30 CFR 56.9300(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  8. Roll-over protective structures (ROPS) and seat belts.

    violationRecord 5176796

    30 CFR 56.14130(i) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  9. Berms or guardrails.

    violationRecord 5176795

    30 CFR 56.9300(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  10. Regular Safety and Health Inspection

    inspectionRecord 6932400

    3.0 on-site hours reported

  11. Annual refresher training.

    violationRecord 9678124

    30 CFR 46.8(a)(1) · $168.00 proposed penalty

  12. Training plan implementation.

    violationRecord 9678123

    30 CFR 46.4(a)(1) · $151.00 proposed penalty

  13. Inspection.

    violationRecord 9678122

    30 CFR 56.4201(a)(1) · $151.00 proposed penalty

  14. First-aid materials.

    violationRecord 9678121

    30 CFR 56.15001 · $151.00 proposed penalty

  15. Safe access.

    violationRecord 9678120

    30 CFR 56.11001 · $151.00 proposed penalty

  16. Safe access.

    violationRecord 9678119

    30 CFR 56.11001 · $151.00 proposed penalty

  17. Regular Safety and Health Inspection

    inspectionRecord F014224

    6.3 on-site hours reported

  18. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5007633

    30 CFR 50.30(a) · $151.00 proposed penalty

  19. Horns and backup alarms.

    violationRecord 5007632

    30 CFR 56.14132(a) · $151.00 proposed penalty

  20. Safety defects; examination, correction and records.

    violationRecord 5007631

    30 CFR 56.14100(b) · $151.00 proposed penalty

  21. Horns and backup alarms.

    violationRecord 5007630

    30 CFR 56.14132(a) · $151.00 proposed penalty

  22. General requirements.

    violationRecord 5007629

    30 CFR 56.4200(b)(2) · $151.00 proposed penalty

  23. General requirements.

    violationRecord 9798240

    30 CFR 56.4200(b)(2) · $151.00 proposed penalty

  24. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 9798239

    30 CFR 50.30(a) · $151.00 proposed penalty

  25. Regular Safety and Health Inspection

    inspectionRecord F01763C

    19.0 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.