← Prairie Eagle-Underground

Prairie Eagle-Underground safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Protection from falls of roof, face and ribs.

    violationRecord 5016851

    30 CFR 75.202(a) · Significant and substantial (S&S)

  2. Protection from falls of roof, face and ribs.

    violationRecord 5016531

    30 CFR 75.202(a) · $336.00 proposed penalty

  3. Spot Inspections

    inspectionRecord F01B413

    103(i) · 7.0 on-site hours reported

  4. Roof control plan.

    violationRecord 9548787

    30 CFR 75.220(a)(1) · $1,126.00 proposed penalty

  5. Protection from falls of roof, face and ribs.

    violationRecord 5016850

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  6. Cable fittings; suitability.

    violationRecord 5016849

    30 CFR 75.515 · $755.00 proposed penalty

  7. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 5011090

    30 CFR 75.1910(j) · $226.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 5011089

    30 CFR 75.400 · $432.00 proposed penalty

  9. Health Technical Investigation

    inspectionRecord F00BE30

    31.5 on-site hours reported

  10. Mine ventilation plan; submission and approval.

    violationRecord 5016331

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  11. Preshift examination at fixed intervals.

    violationRecord 5016330

    30 CFR 75.360(b)(3) · Significant and substantial (S&S)

  12. Roof control plan.

    violationRecord 5016329

    30 CFR 75.220(a)(1) · Significant and substantial (S&S)

  13. Roof control plan.

    violationRecord 5016328

    30 CFR 75.220(a)(1) · Significant and substantial (S&S)

  14. Roof control plan.

    violationRecord 5016327

    30 CFR 75.220(a)(1) · $336.00 proposed penalty

  15. Protection from falls of roof, face and ribs.

    violationRecord 5016326

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  16. Roof control plan.

    violationRecord 9548786

    30 CFR 75.220(a)(1) · $336.00 proposed penalty

  17. Protection from falls of roof, face and ribs.

    violationRecord 9548785

    30 CFR 75.202(a) · $336.00 proposed penalty

  18. Roof control plan.

    violationRecord 9548784

    30 CFR 75.220(a)(1) · $336.00 proposed penalty

  19. Roof control plan.

    violationRecord 9548783

    30 CFR 75.220(a)(1) · $336.00 proposed penalty

  20. Roof control plan.

    violationRecord 9548782

    30 CFR 75.220(a)(1) · $336.00 proposed penalty

  21. Methane monitors.

    violationRecord 5016530

    30 CFR 75.342(a)(4) · $313.00 proposed penalty

  22. Roof Control Technical Investigation

    inspectionRecord 7019284

    126.3 on-site hours reported

  23. Roof control plan.

    violationRecord 9548781

    30 CFR 75.220(a)(1) · $336.00 proposed penalty

  24. Permissible electric face equipment; maintenance.

    violationRecord 5016935

    30 CFR 75.503 · $432.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 5016934

    30 CFR 75.400 · $432.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.