← Prairie Eagle-Underground

Prairie Eagle-Underground safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Roof control plan.

    violationRecord 5016908

    30 CFR 75.220(a)(1) · $313.00 proposed penalty

  2. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5016506

    30 CFR 75.1909(c)(5) · $226.00 proposed penalty

  3. Permissible electric face equipment; maintenance.

    violationRecord 5016505

    30 CFR 75.503 · $432.00 proposed penalty

  4. Permissible electric face equipment; maintenance.

    violationRecord 5016298

    30 CFR 75.503 · $432.00 proposed penalty

  5. Roof control plan.

    violationRecord 5016297

    30 CFR 75.220(a)(1) · $313.00 proposed penalty

  6. Mine ventilation plan; submission and approval.

    violationRecord 5016296

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  7. Spot Inspections

    inspectionRecord F03ABA9

    103(i) · 5.5 on-site hours reported

  8. Cable fittings; suitability.

    violationRecord 5016504

    30 CFR 77.505 · $226.00 proposed penalty

  9. Low- and medium-voltage ground check monitor circuits.

    violationRecord 5011133

    30 CFR 75.902 · $883.00 proposed penalty

  10. Low- and medium-voltage ground check monitor circuits.

    violationRecord 5011132

    30 CFR 75.902 · $883.00 proposed penalty

  11. Electric equipment; examination, testing and maintenance.

    violationRecord 5011131

    30 CFR 75.512 · $366.00 proposed penalty

  12. Storage of materials.

    violationRecord 5011130

    30 CFR 77.208(d) · $226.00 proposed penalty

  13. Power wires and cables; insulation and protection.

    violationRecord 5016907

    30 CFR 75.517 · $245.00 proposed penalty

  14. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5016906

    30 CFR 75.1731(a) · $267.00 proposed penalty

  15. Protection from falls of roof, face and ribs.

    violationRecord 5016503

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  16. Mine ventilation plan; submission and approval.

    violationRecord 5016295

    30 CFR 75.370(a)(1) · $336.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 5016905

    30 CFR 75.400 · $432.00 proposed penalty

  18. Electric equipment; examination, testing and maintenance.

    violationRecord 5016294

    30 CFR 75.512 · $1,219.00 proposed penalty

  19. Power wires and cables; insulation and protection.

    violationRecord 5016293

    30 CFR 75.517 · Significant and substantial (S&S) · $4,047.00 proposed penalty

  20. Spot Inspections

    inspectionRecord F03ABA8

    103(i) · 6.0 on-site hours reported

  21. On-shift examination.

    violationRecord 5016904

    30 CFR 75.362(d)(3)(ii) · $151.00 proposed penalty

  22. Permissible electric face equipment; maintenance.

    violationRecord 5016903

    30 CFR 75.503 · $432.00 proposed penalty

  23. Permissible electric face equipment; maintenance.

    violationRecord 5016902

    30 CFR 75.503 · $432.00 proposed penalty

  24. Accumulation of combustible materials.

    violationRecord 5016901

    30 CFR 75.400 · $432.00 proposed penalty

  25. Power wires and cables; insulation and protection.

    violationRecord 5016502

    30 CFR 75.517 · $245.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.