← Portable Pioneer Plant

Portable Pioneer Plant safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Compliance Follow-up Inspection

    inspectionRecord F0421B2

    1.5 on-site hours reported

  2. Moving machine parts.

    violationRecord 5075475

    30 CFR 56.14107(a) · $151.00 proposed penalty

  3. Construction and maintenance of guards.

    violationRecord 5075474

    30 CFR 56.14112(b) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  4. Construction and maintenance of guards.

    violationRecord 5075473

    30 CFR 56.14112(b) · $697.00 proposed penalty

  5. Construction and maintenance of guards.

    violationRecord 5075472

    30 CFR 56.14112(b) · $697.00 proposed penalty

  6. Construction and maintenance of guards.

    violationRecord 5075471

    30 CFR 56.14112(b) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  7. Safety belts and lines.

    violationRecord 5075470

    30 CFR 56.15005 · Significant and substantial (S&S) · $1,037.00 proposed penalty

  8. Housekeeping.

    violationRecord 5075469

    30 CFR 56.20003(a) · $209.00 proposed penalty

  9. Safe access.

    violationRecord 5075468

    30 CFR 56.11001 · Significant and substantial (S&S) · $3,448.00 proposed penalty

  10. Safe access.

    violationRecord 5075467

    30 CFR 56.11001 · $209.00 proposed penalty

  11. Safety defects; examination, correction and records.

    violationRecord 5075466

    30 CFR 56.14100(b) · $151.00 proposed penalty

  12. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F03E59E

    9.0 on-site hours reported

  13. Spot Inspection

    inspectionRecord F0421A9

    5.0 on-site hours reported

  14. Horns and backup alarms.

    violationRecord 5071864

    30 CFR 56.14132(a) · Significant and substantial (S&S) · $165.00 proposed penalty

  15. Horns and backup alarms.

    violationRecord 5071857

    30 CFR 56.14132(a) · $151.00 proposed penalty

  16. Horns and backup alarms.

    violationRecord 5071856

    30 CFR 56.14132(a) · $151.00 proposed penalty

  17. Correction of hazardous conditions.

    violationRecord 5071855

    30 CFR 56.3200 · Significant and substantial (S&S) · $366.00 proposed penalty

  18. Regular Safety and Health Inspection

    inspectionRecord 6926695

    21.3 on-site hours reported

  19. Housekeeping.

    violationRecord 5071854

    30 CFR 56.20003(a) · Significant and substantial (S&S) · $151.00 proposed penalty

  20. Requirement for container labels.

    violationRecord 5071853

    30 CFR 47.41(a) · $151.00 proposed penalty

  21. Examination of working places.

    violationRecord 5071852

    30 CFR 56.18002(b) · $432.00 proposed penalty

  22. Operators stations.

    violationRecord 5071851

    30 CFR 56.14103(a) · $245.00 proposed penalty

  23. Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.

    violationRecord 5072324

    30 CFR 50.30(a) · $151.00 proposed penalty

  24. Horns and backup alarms.

    violationRecord 5072323

    30 CFR 56.14132(a) · $151.00 proposed penalty

  25. Warning signs.

    violationRecord 5072322

    30 CFR 56.4101 · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.