← Plant # 1

Plant # 1 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Regular Safety and Health Inspection

    inspectionRecord F03A2C0

    5.5 on-site hours reported

  2. Extinguisher recharging or replacement.

    violationRecord 5043964

    30 CFR 56.4203

  3. Regular Safety and Health Inspection

    inspectionRecord F01EB42

    5.3 on-site hours reported

  4. Inspection.

    violationRecord 5043891

    30 CFR 56.4201(a)(2) · $151.00 proposed penalty

  5. Construction and maintenance of guards.

    violationRecord 5043890

    30 CFR 56.14112(a)(1) · $151.00 proposed penalty

  6. Spot Inspection

    inspectionRecord F002B28

    6.3 on-site hours reported

  7. Correction of hazardous conditions.

    violationRecord 5043700

    30 CFR 56.3200 · Significant and substantial (S&S) · $818.00 proposed penalty

  8. Berms or guardrails.

    violationRecord 5043699

    30 CFR 56.9300(d) · $151.00 proposed penalty

  9. Extinguisher recharging or replacement.

    violationRecord 5043698

    30 CFR 56.4203 · $151.00 proposed penalty

  10. Equipment defects.

    violationRecord 5043697

    30 CFR 56.7002 · Significant and substantial (S&S) · $1,320.00 proposed penalty

  11. Regular Safety and Health Inspection

    inspectionRecord F01D668

    15.0 on-site hours reported

  12. Procedures during repairs or maintenance.

    violationRecord 5040486

    30 CFR 56.14105 · $177.00 proposed penalty

  13. Inspection and cover plates.

    violationRecord 5040485

    30 CFR 56.12032 · $151.00 proposed penalty

  14. Electrical conductors.

    violationRecord 5040484

    30 CFR 56.12004 · $177.00 proposed penalty

  15. Regular Safety and Health Inspection

    inspectionRecord F0162E4

    5.5 on-site hours reported

  16. Berms or guardrails.

    violationRecord 9768015

    30 CFR 56.9300(a) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.