Pete Bajo safety activity
MSHA violations, accident reports and inspections.
Safety activity
Fall of roof or back
Accident only
Accident narrative
An Unplanned Fall of Ground occurred at the 4725 - 102 Axs. No injuries or entrapment occurred from this event.
Non-Injury Accident Investigation
6.0 on-site hours reported
Violation — cited standard not reported
Safety defects; examination, correction and records.
30 CFR 57.14100(b) · $288.00 proposed penalty
Escape and evacuation plans.
30 CFR 57.11053(c) · $288.00 proposed penalty
Spillage and leakage.
30 CFR 57.4102 · $755.00 proposed penalty
Spillage and leakage.
30 CFR 57.4102 · $755.00 proposed penalty
Roadway maintenance.
30 CFR 57.9313 · $151.00 proposed penalty
Ground support use.
30 CFR 57.3360 · $549.00 proposed penalty
Regular Safety and Health Inspection
45.5 on-site hours reported
Ground support use.
30 CFR 57.3360 · $1,431.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(d) · $226.00 proposed penalty
Spillage and leakage.
30 CFR 57.4102 · $883.00 proposed penalty
Ground support use.
30 CFR 57.3360 · $432.00 proposed penalty
Identification of power switches.
30 CFR 57.12018 · $245.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(b) · $432.00 proposed penalty
Safety defects; examination, correction and records.
30 CFR 57.14100(c) · $3,184.00 proposed penalty
Waste receptacles.
30 CFR 57.20013 · $151.00 proposed penalty
Ground support use.
30 CFR 57.3360 · $504.00 proposed penalty
Ground support use.
30 CFR 57.3360 · $504.00 proposed penalty
Barricades and warning signs.
30 CFR 57.20011 · $288.00 proposed penalty
Ground support use.
30 CFR 57.3360 · $504.00 proposed penalty
Ground support use.
30 CFR 57.3360 · $504.00 proposed penalty
First aid materials.
30 CFR 57.15001 · $151.00 proposed penalty
Ground support use.
30 CFR 57.3360 · $1,126.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.