Pete Bajo safety activity
MSHA violations, accident reports and inspections.
Safety activity
Other
Injuries due to natural causes
Accident narrative
Ee report feeling face go numb/lost focus while loading. Parked loader, walked for help. Ee reports no memory following that until EE was being moved to helicopter. Witnesses confirm no loss of consciousness. seen at ER, treated, released. At follow-up, ee put off work on seizure protocol. WC denied claim, both ER and clinic note not work related. All air readings normal.
Compliance Follow-up Inspection
2.5 on-site hours reported
Powered haulage
Days restricted activity only
Accident narrative
Ee bringing man basket down on powder truck. Knuckle holding basket broke, man basket tipped, throwing ee into the side rail. Seen at clinic, xrays negative for fracture, diagnosed with rib contusion, released to restricted duty. On 8/31, released to full duty.
Compliance Follow-up Inspection
5.0 on-site hours reported
Fire
Accident only
Accident narrative
Light vehicle traveling up decline when an employee detected a burning odor. Smoke and flames were found coming from underneath vehicle. Attempts were made to extinguish however was unsuccessful and the mine was evacuated. No injuries occurred.
Non-Injury Accident Investigation
42.3 on-site hours reported
Violation — cited standard not reported
Main facilities.
30 CFR 57.6160(b)(6) · $209.00 proposed penalty
Main facilities.
30 CFR 57.6160(b)(6) · $209.00 proposed penalty
Main facilities.
30 CFR 57.6160(b)(6) · $209.00 proposed penalty
Explosive material storage practices.
30 CFR 57.6102(b) · $697.00 proposed penalty
Ground support use.
30 CFR 57.3360 · Significant and substantial (S&S) · $3,736.00 proposed penalty
First aid materials.
30 CFR 57.15001 · $209.00 proposed penalty
Examination of working places.
30 CFR 57.18002(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Separation of transported explosive material.
30 CFR 57.6201(b)(2) · $151.00 proposed penalty
Vehicles.
30 CFR 57.6202(a)(2) · $288.00 proposed penalty
Separation of transported explosive material.
30 CFR 57.6201(b)(2) · $288.00 proposed penalty
Explosive material storage practices.
30 CFR 57.6102 · $151.00 proposed penalty
Separation of stored explosive material.
30 CFR 57.6100(a) · $959.00 proposed penalty
Inspection and cover plates.
30 CFR 57.12032 · $959.00 proposed penalty
Ground support use.
30 CFR 57.3360 · Significant and substantial (S&S) · $8,315.00 proposed penalty
Ground support use.
30 CFR 57.3360 · Significant and substantial (S&S) · $8,315.00 proposed penalty
Regular Safety and Health Inspection
105.5 on-site hours reported
Inspection.
30 CFR 57.4201(a)(5) · $288.00 proposed penalty
General requirements for boilers and pressure vessels.
30 CFR 57.13001 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.