← PANTHER EAGLE MINE

PANTHER EAGLE MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mine ventilation plan; submission and approval.

    violationRecord 5020731

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  2. Roof control plan.

    violationRecord 9847587

    30 CFR 75.220(a)(1) · $336.00 proposed penalty

  3. Roof control plan.

    violationRecord 9847586

    30 CFR 75.220(a)(1) · $336.00 proposed penalty

  4. Roof control plan.

    violationRecord 9847585

    30 CFR 75.220(a)(1) · $336.00 proposed penalty

  5. Accumulation of combustible materials.

    violationRecord 5099343

    30 CFR 75.400 · $165.00 proposed penalty

  6. Protection from falls of roof, face and ribs.

    violationRecord 5099342

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  7. Roof control plan.

    violationRecord 5099341

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  8. Fall of roof or back

    accidentRecord 220261030014

    Fatality

    Accident narrative

    Employee was setting timbers for the next retreat mining lift inby spad 21417 when the slab cut entry that was previously cut fell to the roof bolts causing draw rock to strike the employee. Employee was coherent and alert while being transported outside. During transportation to medical facility they suffered a cardiac arrest. Incident remains under investigation.

  9. Fatal Accident Investigation

    inspectionRecord 6322887

    41.3 on-site hours reported

  10. Violation — cited standard not reported

    violationRecord 5095150
  11. Protection of trailing cables.

    violationRecord 5020727

    30 CFR 75.606 · $642.00 proposed penalty

  12. Roof control plan.

    violationRecord 5020726

    30 CFR 75.220(a)(1) · $336.00 proposed penalty

  13. Quantity and location of firefighting equipment.

    violationRecord 5020725

    30 CFR 75.1100-2(f) · $151.00 proposed penalty

  14. Regular Safety and Health Inspection

    inspectionRecord F021FB2

    518.3 on-site hours reported

  15. Mine ventilation plan; submission and approval.

    violationRecord 5092684

    30 CFR 75.370(a)(1) · $3,022.00 proposed penalty

  16. Escapeways; bituminous and lignite mines.

    violationRecord 5092683

    30 CFR 75.380(c) · Significant and substantial (S&S) · $3,448.00 proposed penalty

  17. Protection of trailing cables.

    violationRecord 5092682

    30 CFR 75.606 · $151.00 proposed penalty

  18. Mine ventilation plan; submission and approval.

    violationRecord 5020724

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  19. Spot Inspection

    inspectionRecord F010B43

    5.5 on-site hours reported

  20. Maintenance of incombustible content of rock dust.

    violationRecord 5025472

    30 CFR 75.403 · $959.00 proposed penalty

  21. Face ventilation control devices.

    violationRecord 5027837

    30 CFR 75.330(b)(2) · $193.00 proposed penalty

  22. Water sprinkler systems; fire warning devices at belt drives.

    violationRecord 5027835

    30 CFR 75.1101-10 · $288.00 proposed penalty

  23. Mechanical equipment guards.

    violationRecord 5027834

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  24. Communications facilities; refuge alternatives.

    violationRecord 5027833

    30 CFR 75.1600-3(a)(1) · $151.00 proposed penalty

  25. Water sprinkler systems; fire warning devices at belt drives.

    violationRecord 5027832

    30 CFR 75.1101-10 · $288.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.