← PANTHER EAGLE MINE

PANTHER EAGLE MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Electric equipment; examination, testing and maintenance.

    violationRecord 5092695

    30 CFR 75.512 · $288.00 proposed penalty

  2. Roof control plan.

    violationRecord 5092694

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  3. Mine ventilation plan; submission and approval.

    violationRecord 5020744

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  4. Accumulation of combustible materials.

    violationRecord 5020743

    30 CFR 75.400 · $366.00 proposed penalty

  5. Violation — cited standard not reported

    violationRecord 5029784

    $215.00 proposed penalty

  6. Dry chemical devices; capacity; minimum requirements.

    violationRecord 5020742

    30 CFR 75.1107-9(a)(1) · $193.00 proposed penalty

  7. Mine ventilation plan; submission and approval.

    violationRecord 5020741

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  8. Mine ventilation plan; submission and approval.

    violationRecord 5020740

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  9. Power wires and cables; insulation and protection.

    violationRecord 5020739

    30 CFR 75.517 · $366.00 proposed penalty

  10. Protection from falls of roof, face and ribs.

    violationRecord 5020738

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  11. Escapeways; bituminous and lignite mines.

    violationRecord 5020737

    30 CFR 75.380(d)(7)(vi) · $288.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 5092693

    30 CFR 75.400 · $165.00 proposed penalty

  13. Mine ventilation plan; submission and approval.

    violationRecord 5020736

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  14. Accumulation of combustible materials.

    violationRecord 5092692

    30 CFR 75.400 · $366.00 proposed penalty

  15. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 5092691

    30 CFR 75.1106-3(a)(2) · $151.00 proposed penalty

  16. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5092690

    30 CFR 75.1731(a) · $193.00 proposed penalty

  17. Other safeguards.

    violationRecord 5092689

    30 CFR 75.1403 · Significant and substantial (S&S) · $959.00 proposed penalty

  18. Mine ventilation plan; submission and approval.

    violationRecord 5020735

    30 CFR 75.370(a)(1) · $193.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 5020734

    30 CFR 75.370(a)(1) · $465.00 proposed penalty

  20. Condition and examination of firefighting equipment.

    violationRecord 5092688

    30 CFR 75.1100-3 · $193.00 proposed penalty

  21. Accumulation of combustible materials.

    violationRecord 5092687

    30 CFR 75.400 · $165.00 proposed penalty

  22. Mine ventilation plan; submission and approval.

    violationRecord 5092686

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 5092685

    30 CFR 75.400 · $366.00 proposed penalty

  24. Rock dusting.

    violationRecord 5020733

    30 CFR 75.402 · $288.00 proposed penalty

  25. Automatic emergency-parking brakes.

    violationRecord 5020732

    30 CFR 75.523-3(b)(5) · $288.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.