Oregon Plant safety activity
MSHA violations, accident reports and inspections.
Safety activity
Impoundment Spot Inspection
3.3 on-site hours reported
Regular Safety and Health Inspection
43.0 on-site hours reported
Identification of power switches.
30 CFR 56.12018 · $165.00 proposed penalty
Protection of gas cylinder valves.
30 CFR 56.16006 · $151.00 proposed penalty
Regular Safety and Health Inspection
55.0 on-site hours reported
Spot Inspection
6.3 on-site hours reported
Handling of materials
Days restricted activity only
Accident narrative
Two maintenance employees were adding a return roller and brackets to BC-124. While putting the roller into the brackets one side went in with ease. That employee then went to help EE's partner by lifting the belt. The struggling employee hit the roller with EE's had causing it to fall out of the bracket and land on the side of EE's boot fracturing EE's pinky toe
Examination of working places.
30 CFR 56.18002(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Housekeeping.
30 CFR 56.20003(a) · Significant and substantial (S&S) · $642.00 proposed penalty
Brakes.
30 CFR 56.14101(a)(2) · $193.00 proposed penalty
Inspection.
30 CFR 56.4201(a)(1) · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
30 CFR 56.12008 · $151.00 proposed penalty
Electrical conductors.
30 CFR 56.12004 · $151.00 proposed penalty
Correction of hazardous conditions.
30 CFR 56.3200 · $193.00 proposed penalty
Grounding circuit enclosures.
30 CFR 56.12025 · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
30 CFR 56.12008 · $151.00 proposed penalty
Regular Safety and Health Inspection
37.8 on-site hours reported
Slip or fall of person
Dys awy frm wrk & restrctd act
Accident narrative
Employee was going to help clean at the top of the penthouse. While walking to the area one of the plugs for a clean out hole was laying on the catwalk and the employee tripped over the plug and hit their knee on the expanded metal flooring.
Compliance Follow-up Inspection
1.0 on-site hours reported
Construction and maintenance of guards.
30 CFR 56.14112(a)(1) · $151.00 proposed penalty
Guarding around lights.
30 CFR 56.12034 · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
30 CFR 56.12008 · $151.00 proposed penalty
Correction of dangerous conditions.
30 CFR 56.12030 · $193.00 proposed penalty
Housekeeping.
30 CFR 56.20003(c) · $151.00 proposed penalty
Inspection.
30 CFR 56.4201(a)(1) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.