  1. Compliance Follow-up Inspection

    inspectionRecord F0408CA

    0.0 on-site hours reported

  2. Spot Inspection

    inspectionRecord F0408C2

    10.3 on-site hours reported

  3. Moving machine parts.

    violationRecord 5100379

    30 CFR 56.14107(a) · Significant and substantial (S&S) · $366.00 proposed penalty

  4. Safe access.

    violationRecord 5100378

    30 CFR 56.11001 · Significant and substantial (S&S) · $366.00 proposed penalty

  5. Site-specific hazard awareness training.

    violationRecord 5100377

    30 CFR 46.11(a) · Significant and substantial (S&S) · $1,467.00 proposed penalty

  6. Inspection.

    violationRecord 5160361

    30 CFR 56.4201(a)(1) · $165.00 proposed penalty

  7. Construction and maintenance of guards.

    violationRecord 5160360

    30 CFR 56.14112(b) · $245.00 proposed penalty

  8. Extinguisher recharging or replacement.

    violationRecord 5160359

    30 CFR 56.4203 · $165.00 proposed penalty

  9. Safe access.

    violationRecord 5160358

    30 CFR 56.11001 · $165.00 proposed penalty

  10. Berms or guardrails.

    violationRecord 5160357

    30 CFR 56.9300(a) · $549.00 proposed penalty

  11. Housekeeping.

    violationRecord 5160356

    30 CFR 56.20003(a) · $165.00 proposed penalty

  12. Electrical conductors.

    violationRecord 5160355

    30 CFR 56.12004 · $549.00 proposed penalty

  13. Safe access.

    violationRecord 5160354

    30 CFR 56.11001 · Significant and substantial (S&S) · $818.00 proposed penalty

  14. Insulation and fittings for power wires and cables.

    violationRecord 5160353

    30 CFR 56.12008 · $549.00 proposed penalty

  15. Regular Safety and Health Inspection

    inspectionRecord F036E41

    7.8 on-site hours reported

  16. Spot Inspection

    inspectionRecord F02552F

    8.5 on-site hours reported

  17. Safety defects; examination, correction and records.

    violationRecord 9990700

    30 CFR 56.14100(b) · $151.00 proposed penalty

  18. Safety defects; examination, correction and records.

    violationRecord 5100208

    30 CFR 56.14100(b) · $151.00 proposed penalty

  19. Safety defects; examination, correction and records.

    violationRecord 5100207

    30 CFR 56.14100(b) · $151.00 proposed penalty

  20. Parking procedures for unattended equipment.

    violationRecord 5100206

    30 CFR 56.14207 · $151.00 proposed penalty

  21. Waste receptacles.

    violationRecord 5100205

    30 CFR 56.20013 · $151.00 proposed penalty

  22. Parking procedures for unattended equipment.

    violationRecord 5100204

    30 CFR 56.14207 · $151.00 proposed penalty

  23. Insulation and fittings for power wires and cables.

    violationRecord 5100203

    30 CFR 56.12008 · $151.00 proposed penalty

  24. Moving machine parts.

    violationRecord 5100202

    30 CFR 56.14107(a) · $151.00 proposed penalty

  25. Berms or guardrails.

    violationRecord 5100201

    30 CFR 56.9300(b) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.