OHIO COUNTY MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Mining machines, cap lamps; requirements.
30 CFR 75.1719-4(b) · $151.00 proposed penalty
Identification of circuit breakers.
30 CFR 75.904 · $366.00 proposed penalty
Dust disease of lungs
Occupatnal illness not deg 1-6
Accident narrative
Employee was diagnosed with Occupational Pneumoconiosis. The employee was diagnosed with 10% permanent partial disability. The employee filed on 5/30/2025. It didn't involve any compliance issues. No equipment involved. No other 50.20 criteria applies.
Fall of roof or back
Accident only
Accident narrative
A roof fall was discovered at 39+00 on the river haulage. The fall was approximately 50 feet long by 16 feet wide and 20 feet high. No other part 50 criteria applies.
Non-Injury Accident Investigation
6.0 on-site hours reported
Criteria—Belt conveyors.
30 CFR 75.1403-5(g) · $151.00 proposed penalty
Criteria—Track haulage roads.
30 CFR 75.1403-8(d) · Significant and substantial (S&S) · $592.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $226.00 proposed penalty
Criteria—Belt conveyors.
30 CFR 75.1403-5(g) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Criteria—Track haulage roads.
30 CFR 75.1403-8(d) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Fire
Accident only
Accident narrative
A fire occurred at the overland belts on the stacker belt. No other part 50 criteria applies.
Spot Inspections
103(i) · 6.0 on-site hours reported
Machinery
Days away from work only
Accident narrative
Employee had EE's left foot on the miner step, reaching for a roof strap, when the miner sumped forward and caused EE's left foot to become caught between the miner. Compliance with rules/regs, PPE, mining equip/system not a factor. Miner proficiency may be a factor.
Spot Inspections
103(i) · 8.0 on-site hours reported
Other safeguards.
30 CFR 75.1403 · $177.00 proposed penalty
Electrical Technical Investigation
13.5 on-site hours reported
Criteria—Track haulage roads.
30 CFR 75.1403-8(d) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Criteria—Track haulage roads.
30 CFR 75.1403-8(d) · Significant and substantial (S&S) · $1,320.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
Employee was loading beams on mule and was struck in the testicles with the beam. Compliance with rules/regs, PPE, mining equip/systems not a factor. Miner proficiency may be a factor.
Handling of materials
Days away from work only
Accident narrative
Employee claims to have been struck by a high pressure hose in EE's left bicep while running the longwall controller. Compliance with rules/regs, PPE mining equip/systems not a factor. Miner proficiency may be a factor.
Approved sampling devices; maintenance and calibration.
30 CFR 70.204(a) · $366.00 proposed penalty
Approved sampling devices; maintenance and calibration.
30 CFR 70.204(a) · $366.00 proposed penalty
Approved sampling devices; maintenance and calibration.
30 CFR 70.204(a) · $366.00 proposed penalty
Approved sampling devices; maintenance and calibration.
30 CFR 70.204(a) · $366.00 proposed penalty
Approved sampling devices; maintenance and calibration.
30 CFR 70.204(a) · $366.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.