  1. Machinery and equipment; operation and maintenance.

    violationRecord 5060558

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  2. Identification check system.

    violationRecord 5060557

    30 CFR 75.1715 · $151.00 proposed penalty

  3. Self-rescue devices; use and location requirements.

    violationRecord 5060556

    30 CFR 75.1714-2(b) · Significant and substantial (S&S) · $592.00 proposed penalty

  4. Self-rescue devices; use and location requirements.

    violationRecord 5060555

    30 CFR 75.1714-2(b) · Significant and substantial (S&S) · $288.00 proposed penalty

  5. Spot Inspections

    inspectionRecord F014BFA

    103(i) · 0.8 on-site hours reported

  6. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 9823373

    30 CFR 75.1910(g) · $267.00 proposed penalty

  7. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 9823372

    30 CFR 75.1909(a)(10) · $267.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 9823371

    30 CFR 75.400 · $592.00 proposed penalty

  9. Emergency tethers.

    violationRecord 9757500

    30 CFR 75.1714-6 · $288.00 proposed penalty

  10. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5060554

    30 CFR 75.1909(b)(5) · $267.00 proposed penalty

  11. Accumulation of combustible materials.

    violationRecord 5060553

    30 CFR 75.400 · $592.00 proposed penalty

  12. Electric equipment; examination, testing and maintenance.

    violationRecord 5060552

    30 CFR 75.512 · $336.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 9757499

    30 CFR 75.400 · $592.00 proposed penalty

  14. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 9757498

    30 CFR 75.1909(a)(10) · $267.00 proposed penalty

  15. Spot Inspections

    inspectionRecord 6972365

    103(i) · 6.8 on-site hours reported

  16. Spot Inspections

    inspectionRecord F014BF9

    103(i) · 0.8 on-site hours reported

  17. Machinery

    accidentRecord 220250920018

    Days away from work only

    Accident narrative

    EE was drilling a hole for a roof bolt. As EE was installing pusher they continued with up pressure without the drill steel being in the chuck. The drill steel sprung back and cut their hand between the thumb and index finger.

  18. Travelways at surface installations.

    violationRecord 9821724

    30 CFR 77.205(b) · $267.00 proposed penalty

  19. Storage of materials.

    violationRecord 9821723

    30 CFR 77.208(e) · $267.00 proposed penalty

  20. Handling of materials

    accidentRecord 220250900022

    Days away from work only

    Accident narrative

    IE claimed a strained back from cleaning at the dewatering screen. The employee did not report the incident until 3-21-25 after being brought outside due to a disciplinary action.

  21. Slip or fall of person

    accidentRecord 220250900021

    Days away from work only

    Accident narrative

    IE was walking down the steps from the gate floor to the slope tail when they slipped and fell.

  22. Protection from falls of roof, face and ribs.

    violationRecord 9826570

    30 CFR 75.202(b) · Significant and substantial (S&S) · $9,757.00 proposed penalty

  23. Methane monitors.

    violationRecord 9757497

    30 CFR 75.342(a)(4) · $267.00 proposed penalty

  24. Escapeways; bituminous and lignite mines.

    violationRecord 9823370

    30 CFR 75.380(d)(7)(vii) · $642.00 proposed penalty

  25. Escapeways; bituminous and lignite mines.

    violationRecord 9823369

    30 CFR 75.380(d)(7)(i) · Significant and substantial (S&S) · $10,569.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.