← Oak Grove Mine

Oak Grove Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Roof control plan.

    violationRecord 5063145

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $14,557.00 proposed penalty

  2. Roof control plan.

    violationRecord 5063144

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $14,557.00 proposed penalty

  3. Verbal Hazard Complaint Inspections

    inspectionRecord F01A729

    2.0 on-site hours reported

  4. Roof control plan.

    violationRecord 5063143

    30 CFR 75.220(a)(1) · $1,968.00 proposed penalty

  5. Roof control plan.

    violationRecord 5063142

    30 CFR 75.220(a)(1) · $1,968.00 proposed penalty

  6. Machinery and equipment; operation and maintenance.

    violationRecord 9828964

    30 CFR 75.1725(a) · $592.00 proposed penalty

  7. Spot Inspections

    inspectionRecord F02E12B

    103(i) · 6.0 on-site hours reported

  8. Spot Inspections

    inspectionRecord F02E12C

    103(i) · 4.5 on-site hours reported

  9. Roof control plan.

    violationRecord 5063141

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $9,757.00 proposed penalty

  10. Escapeways; bituminous and lignite mines.

    violationRecord 5063140

    30 CFR 75.380(d)(7)(vi) · $313.00 proposed penalty

  11. Mine ventilation plan; submission and approval.

    violationRecord 5063139

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  12. Testing, examination and maintenance.

    violationRecord 9828963

    30 CFR 75.821(a) · $642.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 9828962

    30 CFR 75.400 · $1,431.00 proposed penalty

  14. Machinery and equipment; operation and maintenance.

    violationRecord 9828961

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $20,047.00 proposed penalty

  15. Drill dust control at underground areas of underground mines.

    violationRecord 9828960

    30 CFR 72.630(b) · Significant and substantial (S&S) · $11,450.00 proposed penalty

  16. Accumulation of combustible materials.

    violationRecord 9828959

    30 CFR 75.400 · Significant and substantial (S&S) · $3,736.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 9828958

    30 CFR 75.400 · Significant and substantial (S&S) · $11,450.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 5063138

    30 CFR 75.400 · $697.00 proposed penalty

  19. Condition and examination of firefighting equipment.

    violationRecord 5063137

    30 CFR 75.1100-3 · $336.00 proposed penalty

  20. Ventilation controls.

    violationRecord 5063136

    30 CFR 75.333(c)(2) · $313.00 proposed penalty

  21. Escapeways; bituminous and lignite mines.

    violationRecord 5063135

    30 CFR 75.380(d)(7)(vi) · $313.00 proposed penalty

  22. Roof control plan.

    violationRecord 5063134

    30 CFR 75.220(a)(1) · $592.00 proposed penalty

  23. Roof control plan.

    violationRecord 5063133

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $14,557.00 proposed penalty

  24. Ventilation controls.

    violationRecord 5063132

    30 CFR 75.333(c) · $313.00 proposed penalty

  25. Protection from falls of roof, face and ribs.

    violationRecord 5063131

    30 CFR 75.202(a) · $2,712.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.