← Oak Grove Mine

Oak Grove Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Short circuit protection of trailing cables.

    violationRecord 5061548

    30 CFR 75.601 · $465.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 5061547

    30 CFR 75.400 · $755.00 proposed penalty

  3. Ventilation controls.

    violationRecord 5061546

    30 CFR 75.333(h) · $398.00 proposed penalty

  4. Permissible electric face equipment; maintenance.

    violationRecord 5190138

    30 CFR 75.503 · Significant and substantial (S&S) · $2,936.00 proposed penalty

  5. Refuge alternatives.

    violationRecord 5190137

    30 CFR 75.1506(h)(2) · $313.00 proposed penalty

  6. Powered haulage

    accidentRecord 220260400032

    Days away from work only

    Accident narrative

    IE was running a rock truck when they hit a pothole causing them to bounce and strain their back.

  7. Maintenance of incombustible content of rock dust.

    violationRecord 5190136

    30 CFR 75.403 · $465.00 proposed penalty

  8. Escapeways; bituminous and lignite mines.

    violationRecord 5190135

    30 CFR 75.380(h) · $151.00 proposed penalty

  9. Automatic fire warning devices.

    violationRecord 5190134

    30 CFR 75.1103 · $313.00 proposed penalty

  10. Protection from falls of roof, face and ribs.

    violationRecord 5061934

    30 CFR 75.202(a) · $592.00 proposed penalty

  11. Condition and examination of firefighting equipment.

    violationRecord 5061933

    30 CFR 75.1100-3 · $336.00 proposed penalty

  12. Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.

    violationRecord 5061932

    30 CFR 75.1714-3(d) · $313.00 proposed penalty

  13. Spot Inspections

    inspectionRecord F02657C

    103(i) · 3.3 on-site hours reported

  14. Spot Inspections

    inspectionRecord F02657B

    103(i) · 6.0 on-site hours reported

  15. Mine ventilation plan; submission and approval.

    violationRecord 5061545

    30 CFR 75.370(a)(1) · $959.00 proposed penalty

  16. Protection from falls of roof, face and ribs.

    violationRecord 5061544

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  17. Fire suppression systems for diesel-powered equipment and fuel transportation units.

    violationRecord 5061543

    30 CFR 75.1911(a)(2) · $313.00 proposed penalty

  18. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5061542

    30 CFR 75.1909(a)(5) · $313.00 proposed penalty

  19. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 5061541

    30 CFR 75.1910(l) · $313.00 proposed penalty

  20. Accumulation of combustible materials.

    violationRecord 5061540

    30 CFR 75.400 · $755.00 proposed penalty

  21. Training of miners assigned to a task in which they have had no previous experience; minimum courses of instruction.

    violationRecord 5190855

    30 CFR 48.7 · Significant and substantial (S&S) · $2,312.00 proposed penalty

  22. Other safeguards.

    violationRecord 5190854

    30 CFR 75.1403

  23. Grounding metallic frames, casings, and other enclosures of electric equipment.

    violationRecord 5190133

    30 CFR 75.701 · Significant and substantial (S&S) · $1,550.00 proposed penalty

  24. Diesel equipment inventory.

    violationRecord 5190132

    30 CFR 72.520(b) · $151.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 5190131

    30 CFR 75.400 · $755.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.