← Oak Grove Mine

Oak Grove Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Permissible electric face equipment; maintenance.

    violationRecord 5191452

    30 CFR 75.503 · Significant and substantial (S&S) · $2,712.00 proposed penalty

  2. Electric equipment; examination, testing and maintenance.

    violationRecord 5191451

    30 CFR 75.512 · $465.00 proposed penalty

  3. Machinery and equipment; operation and maintenance.

    violationRecord 5191450

    30 CFR 75.1725(a) · $267.00 proposed penalty

  4. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5061966

    30 CFR 75.1909(a)(1) · $209.00 proposed penalty

  5. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5061965

    30 CFR 75.1909(a)(1) · $209.00 proposed penalty

  6. Handtools (nonpowered)

    accidentRecord 220261460021

    No dys awy frm wrk,no rstr act

    Accident narrative

    IE was repairing a suction line on a roof bolter when the knife EE was using cut the palm of EE's hand. Only reportable due to receiving sutures.

  7. Spot Inspections

    inspectionRecord F01A752

    103(i) · 6.0 on-site hours reported

  8. Spot Inspections

    inspectionRecord F01A751

    103(i) · 7.5 on-site hours reported

  9. Ventilation controls.

    violationRecord 5191449

    30 CFR 75.333(c) · $1,037.00 proposed penalty

  10. Handling of materials

    accidentRecord 220261400020

    Days away from work only

    Accident narrative

    IE was removing belt structure at the LW tail when EE allowed EE's left index finger to get smashed between a top frame and the belt rail causing a cut.

  11. Additional self-contained self-rescuers (SCSRs).

    violationRecord 5191448

    30 CFR 75.1714-4(b) · $1,320.00 proposed penalty

  12. On-shift examination.

    violationRecord 5061959

    30 CFR 75.362(d)(1)(iii) · $313.00 proposed penalty

  13. Roof control plan.

    violationRecord 5061958

    30 CFR 75.220(a)(1) · $592.00 proposed penalty

  14. Protection from falls of roof, face and ribs.

    violationRecord 5190503

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  15. Transportation of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 5191447

    30 CFR 75.1106-2(a)(1) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  16. Electric equipment; examination, testing and maintenance.

    violationRecord 5191446

    30 CFR 75.512 · $465.00 proposed penalty

  17. Roof control plan.

    violationRecord 5190502

    30 CFR 75.220(a)(1) · $592.00 proposed penalty

  18. Protection from falls of roof, face and ribs.

    violationRecord 5190501

    30 CFR 75.202(a) · $549.00 proposed penalty

  19. Spot Inspections

    inspectionRecord F01A750

    103(i) · 8.0 on-site hours reported

  20. Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.

    violationRecord 5191445

    30 CFR 75.1714-3(b) · $1,320.00 proposed penalty

  21. Roof control plan.

    violationRecord 5191444

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $9,757.00 proposed penalty

  22. Mine ventilation plan; submission and approval.

    violationRecord 5191443

    30 CFR 75.370(a)(1) · $1,550.00 proposed penalty

  23. Roof control plan.

    violationRecord 5191442

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $9,757.00 proposed penalty

  24. Handling of materials

    accidentRecord 220261330012

    Days away from work only

    Accident narrative

    IE reported on 5-4-26 that EE felt a pop in EE's lower back as EE was picking up and stacking cement block on 5-2-26.

  25. Accumulation of combustible materials.

    violationRecord 5063319

    30 CFR 75.400 · $2,936.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.