Oak Grove Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Protection from falls of roof, face and ribs.

    violationRecord 5192814

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  2. Roof control plan.

    violationRecord 5192813

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $4,383.00 proposed penalty

  3. Protection from falls of roof, face and ribs.

    violationRecord 5192812

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  4. Ventilation controls.

    violationRecord 5192024

    30 CFR 75.333(h) · $366.00 proposed penalty

  5. Mechanical equipment guards.

    violationRecord 5192023

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  6. Machinery and equipment; operation and maintenance.

    violationRecord 5192022

    30 CFR 75.1725(a) · $592.00 proposed penalty

  7. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 5192021

    30 CFR 75.1106-3(a)(2) · $313.00 proposed penalty

  8. Mine ventilation plan; submission and approval.

    violationRecord 5190668

    30 CFR 75.370(a)(1) · $1,679.00 proposed penalty

  9. Escapeways; bituminous and lignite mines.

    violationRecord 5190511

    30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $5,144.00 proposed penalty

  10. Protection from falls of roof, face and ribs.

    violationRecord 5190510

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  11. Roof control plan.

    violationRecord 5190509

    30 CFR 75.220(a)(1) · $592.00 proposed penalty

  12. Escapeways; bituminous and lignite mines.

    violationRecord 5190508

    30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $5,144.00 proposed penalty

  13. Roof control plan.

    violationRecord 5190507

    30 CFR 75.220(a)(1) · $1,219.00 proposed penalty

  14. Accumulation of combustible materials.

    violationRecord 5190667

    30 CFR 75.400 · $2,712.00 proposed penalty

  15. Verbal Hazard Complaint Inspections

    inspectionRecord 6917472

    3.8 on-site hours reported

  16. Accumulation of combustible materials.

    violationRecord 5192426

    30 CFR 75.400 · $818.00 proposed penalty

  17. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5192425

    30 CFR 75.1909(a)(10) · $313.00 proposed penalty

  18. Loading and haulage equipment; operation.

    violationRecord 5192424

    30 CFR 77.1607(p) · $313.00 proposed penalty

  19. Loading and haulage equipment; operation.

    violationRecord 5192423

    30 CFR 77.1607(p) · $151.00 proposed penalty

  20. Spot Inspections

    inspectionRecord 6972564

    103(i) · 5.0 on-site hours reported

  21. Annual refresher training of miners; minimum courses of instruction; hours of instruction.

    violationRecord 5192422

    30 CFR 48.8(a) · $374.00 proposed penalty

  22. Machinery

    accidentRecord 220261630007

    Days away from work only

    Accident narrative

    IE was operating the shearer when a small rock fell from between the shields and hit EE's right pinky finger against the pan line causing a cut.

  23. Powered haulage

    accidentRecord 220261600007

    Days away from work only

    Accident narrative

    IE was riding on a mantrip when EE hit EE's head on a hanging deluge pipe causing a strain in EE's neck.

  24. Spot Inspections

    inspectionRecord F03E494

    103(i) · 7.0 on-site hours reported

  25. Drill dust control at underground areas of underground mines.

    violationRecord 5191462

    30 CFR 72.630(b) · $504.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.