  1. Roof control plan.

    violationRecord 5192722

    30 CFR 75.220(a)(1) · $642.00 proposed penalty

  2. Identification of circuit breakers.

    violationRecord 5192721

    30 CFR 75.904 · $313.00 proposed penalty

  3. Short circuit protection of trailing cables.

    violationRecord 5192720

    30 CFR 75.601 · $313.00 proposed penalty

  4. Handling of materials

    accidentRecord 220262290016

    Days away from work only

    Accident narrative

    IE was recovering tubes when they dropped the tubes and it rolled down their knee hyperextending it.

  5. Electric equipment; examination, testing and maintenance.

    violationRecord 5192719

    30 CFR 75.512 · $504.00 proposed penalty

  6. Roof control plan.

    violationRecord 5192718

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  7. Mechanical equipment guards.

    violationRecord 5192829

    30 CFR 75.1722(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 5192828

    30 CFR 75.400 · $818.00 proposed penalty

  9. Spot Inspections

    inspectionRecord F027169

    103(i) · 6.3 on-site hours reported

  10. Transformers; installation and guarding.

    violationRecord 5190954

    30 CFR 77.509(c) · $1,037.00 proposed penalty

  11. Communications facilities; refuge alternatives.

    violationRecord 5192827

    30 CFR 75.1600-3(a)(2) · $209.00 proposed penalty

  12. Roof control plan.

    violationRecord 5192717

    30 CFR 75.220(a)(1) · $592.00 proposed penalty

  13. Roof control plan.

    violationRecord 5192716

    30 CFR 75.220(a)(1) · $592.00 proposed penalty

  14. Condition and examination of firefighting equipment.

    violationRecord 5192715

    30 CFR 75.1100-3 · $165.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 5192714

    30 CFR 75.400 · $818.00 proposed penalty

  16. Ventilation controls.

    violationRecord 5192713

    30 CFR 75.333(h) · $398.00 proposed penalty

  17. Electric equipment; examination, testing and maintenance.

    violationRecord 5192712

    30 CFR 75.512 · $504.00 proposed penalty

  18. Electric equipment; examination, testing and maintenance.

    violationRecord 5192711

    30 CFR 75.512 · $504.00 proposed penalty

  19. Storage of liquefied and nonliquefied compressed gas cylinders; requirements.

    violationRecord 5192710

    30 CFR 75.1106-3(a)(2) · $151.00 proposed penalty

  20. Spot Inspections

    inspectionRecord F027168

    103(i) · 9.5 on-site hours reported

  21. Protection from falls of roof, face and ribs.

    violationRecord 5192826

    30 CFR 75.202(a) · $245.00 proposed penalty

  22. Ventilation controls.

    violationRecord 5192825

    30 CFR 75.333(h) · $398.00 proposed penalty

  23. Mine ventilation plan; submission and approval.

    violationRecord 5192709

    30 CFR 75.370(a)(1) · $504.00 proposed penalty

  24. Roof control plan.

    violationRecord 5192708

    30 CFR 75.220(a)(1) · $267.00 proposed penalty

  25. Permissible electric face equipment; maintenance.

    violationRecord 5192707

    30 CFR 75.503 · Significant and substantial (S&S) · $2,712.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.