← NORTH EAGLE MINE

NORTH EAGLE MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Ventilation controls.

    violationRecord 9843179

    30 CFR 75.333(e)(1)(ii) · $209.00 proposed penalty

  2. Roof control plan.

    violationRecord 9843178

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  3. Escapeways; bituminous and lignite mines.

    violationRecord 9848805

    30 CFR 75.380(d)(7)(iii) · $151.00 proposed penalty

  4. Ventilation controls.

    violationRecord 9843177

    30 CFR 75.333(h) · $209.00 proposed penalty

  5. Escapeways; bituminous and lignite mines.

    violationRecord 9843176

    30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  6. Protection from falls of roof, face and ribs.

    violationRecord 9843175

    30 CFR 75.202(a) · $288.00 proposed penalty

  7. Roof control plan.

    violationRecord 9843174

    30 CFR 75.220(a)(1) · $267.00 proposed penalty

  8. Roof bolting.

    violationRecord 9843173

    30 CFR 75.204(c)(1) · $209.00 proposed penalty

  9. Regular Safety and Health Inspection

    inspectionRecord 6321482

    306.8 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.