Noble Mine #2 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c)
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c)
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c)
Regular Safety and Health Inspection
43.5 on-site hours reported
Spot Inspection
1.0 on-site hours reported
Loading and haulage equipment; installations.
30 CFR 77.1605(d) · $151.00 proposed penalty
Permissible exposure level.
30 CFR 62.130(a) · Significant and substantial (S&S) · $336.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · $151.00 proposed penalty
Mobile equipment; automatic warning devices.
30 CFR 77.410(a)(1) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · $151.00 proposed penalty
Regular Safety and Health Inspection
53.0 on-site hours reported
Spot Inspection
5.0 on-site hours reported
Drill dust control at surface mines and surface areas of underground mines.
30 CFR 72.620 · $151.00 proposed penalty
Regular Safety and Health Inspection
63.8 on-site hours reported
Powered haulage
Days away from work only
Accident narrative
Road was wet and driver lost control of rock truck when going down the hill causing them to lose control and they hit the side of the mountain. Employee drove themselves to the hospital to get checked out.
Loading and haulage equipment; installations.
30 CFR 77.1605(b) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · $151.00 proposed penalty
Regular Safety and Health Inspection
55.3 on-site hours reported
Spot Inspection
11.0 on-site hours reported
Daily inspection of surface coal mine; certified person; reports of inspection.
30 CFR 77.1713(a) · Significant and substantial (S&S) · $3,022.00 proposed penalty
Highwalls, pits and spoil banks; plans.
30 CFR 77.1000 · Significant and substantial (S&S) · $18,504.00 proposed penalty
Highwalls, pits and spoil banks; plans.
30 CFR 77.1000 · Significant and substantial (S&S) · $226.00 proposed penalty
Hazard training.
30 CFR 48.31(b) · $151.00 proposed penalty
Loading and haulage equipment; installations.
30 CFR 77.1605(k) · Significant and substantial (S&S) · $4,152.00 proposed penalty
Loading and haulage equipment; operation.
30 CFR 77.1607(i) · Significant and substantial (S&S) · $245.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.