← NO. 77

NO. 77 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Accumulation of combustible materials.

    violationRecord 5084297

    30 CFR 75.400 · $592.00 proposed penalty

  2. Other safeguards.

    violationRecord 5084296

    30 CFR 75.1403 · $209.00 proposed penalty

  3. Spot Inspections

    inspectionRecord F015149

    103(i) · 8.0 on-site hours reported

  4. Permissible electric face equipment; maintenance.

    violationRecord 9778801

    30 CFR 75.503 · $313.00 proposed penalty

  5. Drill dust control at underground areas of underground mines.

    violationRecord 9779919

    30 CFR 72.630(b) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 5082103

    30 CFR 75.400 · $549.00 proposed penalty

  7. Communications facilities; refuge alternatives.

    violationRecord 5082102

    30 CFR 75.1600-3(a)(1) · $209.00 proposed penalty

  8. Spot Inspections

    inspectionRecord F010ABA

    103(i) · 5.5 on-site hours reported

  9. Automatic emergency-parking brakes.

    violationRecord 5082101

    30 CFR 75.523-3(c)(2) · $165.00 proposed penalty

  10. Permissible electric face equipment; maintenance.

    violationRecord 5082100

    30 CFR 75.503 · $226.00 proposed penalty

  11. On-shift examination.

    violationRecord 5084295

    30 CFR 75.362(b) · Significant and substantial (S&S) · $818.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 5084294

    30 CFR 75.400 · Significant and substantial (S&S) · $2,133.00 proposed penalty

  13. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5084293

    30 CFR 75.1731(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  14. Mine ventilation plan; submission and approval.

    violationRecord 5084292

    30 CFR 75.370(a)(1) · $245.00 proposed penalty

  15. Spot Inspections

    inspectionRecord F0142CC

    103(i) · 5.5 on-site hours reported

  16. Maintenance of incombustible content of rock dust.

    violationRecord 5084290

    30 CFR 75.403 · $165.00 proposed penalty

  17. Permissible exposure level.

    violationRecord 9779917

    30 CFR 62.130(b) · $245.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 5084286

    30 CFR 75.400 · $432.00 proposed penalty

  19. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5084285

    30 CFR 75.1731(a) · $209.00 proposed penalty

  20. Ventilation controls.

    violationRecord 5084282

    30 CFR 75.333(d)(2) · $165.00 proposed penalty

  21. Protection from falls of roof, face and ribs.

    violationRecord 5084281

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  22. Mine ventilation plan; submission and approval.

    violationRecord 5084280

    30 CFR 75.370(a)(1) · $245.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 5084279

    30 CFR 75.400 · $432.00 proposed penalty

  24. Spot Inspections

    inspectionRecord F0155CF

    103(i) · 12.0 on-site hours reported

  25. Permissible electric face equipment; maintenance.

    violationRecord 5084278

    30 CFR 75.503 · $226.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.