← NO. 77

NO. 77 safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Electric equipment; examination, testing and maintenance.

    violationRecord 5084504

    30 CFR 75.512 · Significant and substantial (S&S)

  2. Permissible electric face equipment; maintenance.

    violationRecord 5084503

    30 CFR 75.503

  3. Electric equipment; examination, testing and maintenance.

    violationRecord 5084502

    30 CFR 75.512

  4. Roof control plan.

    violationRecord 5084683

    30 CFR 75.220(a)(1)

  5. Accumulation of combustible materials.

    violationRecord 5084682

    30 CFR 75.400

  6. Preshift examination at fixed intervals.

    violationRecord 5080082

    30 CFR 75.360(b)(11)(i) · Significant and substantial (S&S)

  7. Ventilation controls.

    violationRecord 5080081

    30 CFR 75.333(b)(4)

  8. Mining methods.

    violationRecord 5080080

    30 CFR 75.203(e)(2) · Significant and substantial (S&S)

  9. Accumulation of combustible materials.

    violationRecord 5084681

    30 CFR 75.400

  10. Electrical components; permissibility requirements.

    violationRecord 5084680

    30 CFR 75.1103-7(a)

  11. Accumulation of combustible materials.

    violationRecord 5084679

    30 CFR 75.400

  12. Accumulation of combustible materials.

    violationRecord 5084678

    30 CFR 75.400

  13. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5084677

    30 CFR 75.1731(a)

  14. Protection of trailing cables.

    violationRecord 5084044

    30 CFR 75.606

  15. Spot Inspections

    inspectionRecord F010AC8

    103(i) · 4.5 on-site hours reported

  16. Regular Safety and Health Inspection

    inspectionRecord F010AC7

    51.3 on-site hours reported

  17. Slip or fall of person

    accidentRecord 220262890013

    Days away from work only

    Accident narrative

    EE stated that there was cable slack from the roof bolter that was not hung lying on the right-side rib of the bolt machine. When the bolter operator backed up, the cable slack tightened up and caught EE's feet. EE fell into the mine rib striking EE's left shoulder. EE was taken off work on 10/14/2026.

  18. Spot Inspections

    inspectionRecord F01515C

    103(i) · 6.0 on-site hours reported

  19. Fall of roof or back

    accidentRecord 220262530027

    Accident only

    Accident narrative

    A rock fall occurred on the 1 East Mains at break 19 in #2 and #3 entries. The fall is approximately 36" x 16' x 20'

  20. Non-Injury Accident Investigation

    inspectionRecord F014C8B

    14.5 on-site hours reported

  21. Protection from falls of roof, face and ribs.

    violationRecord 5082325

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  22. Violation — cited standard not reported

    violationRecord 5082324
  23. Spot Inspections

    inspectionRecord F0155DA

    103(i) · 4.5 on-site hours reported

  24. Permissible electric face equipment; maintenance.

    violationRecord 5084672

    30 CFR 75.503 · $336.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 5084492

    30 CFR 75.400 · $549.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.