No 7 Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(i) · Significant and substantial (S&S) · $959.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $288.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $336.00 proposed penalty
Spot Inspections
103(i) · 8.0 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · $336.00 proposed penalty
Mobile equipment; automatic warning devices.
30 CFR 77.410(a)(1) · Significant and substantial (S&S) · $151.00 proposed penalty
Protective clothing; requirements.
30 CFR 77.1710(i) · Significant and substantial (S&S) · $151.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
30 CFR 75.1106-3(a)(2) · $193.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $288.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Spot Inspections
103(i) · 7.0 on-site hours reported
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(c) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $288.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $226.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $336.00 proposed penalty
Mechanical equipment guards.
30 CFR 75.1722(b) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Roof Control Technical Investigation
44.3 on-site hours reported
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $288.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · Significant and substantial (S&S) · $1,679.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(iv) · Significant and substantial (S&S) · $959.00 proposed penalty
Storage of liquefied and nonliquefied compressed gas cylinders; requirements.
30 CFR 75.1106-3(a)(2) · Significant and substantial (S&S) · $959.00 proposed penalty
Maintenance of diesel-powered equipment.
30 CFR 75.1914(a) · $193.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.