← No 7 Mine

No 7 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Accumulation of combustible materials.

    violationRecord 9828863

    30 CFR 75.400 · $432.00 proposed penalty

  2. Atmospheric monitoring systems.

    violationRecord 9822489

    30 CFR 75.351(k) · $151.00 proposed penalty

  3. Accumulation of combustible materials.

    violationRecord 9822488

    30 CFR 75.400 · $432.00 proposed penalty

  4. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord F016C0C

    4.0 on-site hours reported

  5. Automated Temporary Roof Support (ATRS) systems.

    violationRecord 9824096

    30 CFR 75.209(d) · $226.00 proposed penalty

  6. Roof control plan.

    violationRecord 9824095

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 9822487

    30 CFR 75.400 · $755.00 proposed penalty

  8. Loading and haulage equipment; installations.

    violationRecord 9631782

    30 CFR 77.1605(d) · $336.00 proposed penalty

  9. Spot Inspections

    inspectionRecord 6975852

    103(i) · 6.5 on-site hours reported

  10. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9828862

    30 CFR 75.1731(a) · $226.00 proposed penalty

  11. Flammable liquids; storage.

    violationRecord 5060686

    30 CFR 77.1103(a) · $226.00 proposed penalty

  12. Flammable liquids; storage.

    violationRecord 5060685

    30 CFR 77.1103(d) · $366.00 proposed penalty

  13. Loading and haulage equipment; installations.

    violationRecord 5060684

    30 CFR 77.1605(d) · $226.00 proposed penalty

  14. Examination and maintenance of firefighting equipment.

    violationRecord 5060683

    30 CFR 77.1110 · $165.00 proposed penalty

  15. Flammable liquids; storage.

    violationRecord 5060682

    30 CFR 77.1103(c) · $151.00 proposed penalty

  16. Respirable dust samples; report to operator; posting.

    violationRecord 9823351

    30 CFR 71.208(c) · $151.00 proposed penalty

  17. Examination and maintenance of firefighting equipment.

    violationRecord 5060674

    30 CFR 77.1110 · $151.00 proposed penalty

  18. Accumulations of combustible materials.

    violationRecord 5060673

    30 CFR 77.1104 · $151.00 proposed penalty

  19. Spot Inspections

    inspectionRecord 6974477

    103(i) · 8.0 on-site hours reported

  20. Roof Control Technical Investigation

    inspectionRecord 6920853

    64.8 on-site hours reported

  21. Protection from falls of roof, face and ribs.

    violationRecord 9824094

    30 CFR 75.202(a) · $336.00 proposed penalty

  22. Roof bolting.

    violationRecord 9824093

    30 CFR 75.204(c)(1) · $226.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 9828861

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  24. Protection from falls of roof, face and ribs.

    violationRecord 9825864

    30 CFR 75.202(a) · $1,126.00 proposed penalty

  25. Air quality.

    violationRecord 9825863

    30 CFR 75.321(a)(2) · $755.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.