← No 7 Mine

No 7 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Ventilation controls.

    violationRecord 9826591

    30 CFR 75.333(e)(1)(ii) · $226.00 proposed penalty

  2. Roof control plan.

    violationRecord 9826590

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  3. Accumulation of combustible materials.

    violationRecord 9826589

    30 CFR 75.400 · $432.00 proposed penalty

  4. Ventilation controls.

    violationRecord 9826588

    30 CFR 75.333(h) · $245.00 proposed penalty

  5. Roof control plan.

    violationRecord 9826587

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  6. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9826586

    30 CFR 75.1731(b) · $226.00 proposed penalty

  7. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 9826585

    30 CFR 75.1910(j) · $226.00 proposed penalty

  8. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 9826584

    30 CFR 75.1910(f) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 9826583

    30 CFR 75.400 · Significant and substantial (S&S) · $2,133.00 proposed penalty

  10. Roof control plan.

    violationRecord 9826582

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  11. Roof control plan.

    violationRecord 9826581

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  12. Ventilation controls.

    violationRecord 9826580

    30 CFR 75.333(h) · $245.00 proposed penalty

  13. Roof control plan.

    violationRecord 9826579

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  14. Weekly examination.

    violationRecord 9756559

    30 CFR 75.364(h) · $151.00 proposed penalty

  15. Escapeway maps.

    violationRecord 9823389

    30 CFR 75.1505(b) · $151.00 proposed penalty

  16. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 9823388

    30 CFR 75.1909(a)(10) · $226.00 proposed penalty

  17. Spot Inspections

    inspectionRecord 6974584

    103(i) · 6.5 on-site hours reported

  18. Accumulation of combustible materials.

    violationRecord 9823387

    30 CFR 75.400 · $432.00 proposed penalty

  19. Belt air course ventilation.

    violationRecord 9823386

    30 CFR 75.350(b)(7) · $642.00 proposed penalty

  20. Communications facilities; refuge alternatives.

    violationRecord 9823385

    30 CFR 75.1600-3(a)(2) · $2,133.00 proposed penalty

  21. Mine ventilation plan; submission and approval.

    violationRecord 9823384

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $3,736.00 proposed penalty

  22. Roof control plan.

    violationRecord 9823383

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  23. Accumulation of combustible materials.

    violationRecord 9823382

    30 CFR 75.400 · $432.00 proposed penalty

  24. Accumulation of combustible materials.

    violationRecord 9826578

    30 CFR 75.400 · $432.00 proposed penalty

  25. Escapeways; bituminous and lignite mines.

    violationRecord 9826577

    30 CFR 75.380(d)(7)(vi) · $226.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.