← No 7 Mine

No 7 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Loading and haulage equipment; installations.

    violationRecord 9758708

    30 CFR 77.1605(k) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  2. Surface installations; general.

    violationRecord 9758707

    30 CFR 77.200 · $245.00 proposed penalty

  3. Mechanical equipment guards.

    violationRecord 9758706

    30 CFR 77.400(d) · $336.00 proposed penalty

  4. Loading and haulage equipment; operation.

    violationRecord 9758705

    30 CFR 77.1607(bb) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  5. Travelways at surface installations.

    violationRecord 9758704

    30 CFR 77.205(b) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  6. Surface installations; general.

    violationRecord 9758703

    30 CFR 77.200 · $245.00 proposed penalty

  7. Handling of materials

    accidentRecord 220251150036

    Days away from work only

    Accident narrative

    Employee was assisting with installing a bull hose on a 8" Aqua pipe for electric pump on NE-9, when employee lost balance and fell into the water and the 8" Aqua pipe fell on their left foot/ankle causing it to become caught between the mine floor and pipe, resulting in a sprain to their left foot/ankle.

  8. Spot Inspections

    inspectionRecord F025C0E

    103(i) · 3.0 on-site hours reported

  9. Ventilation controls.

    violationRecord 9827110

    30 CFR 75.333(c)(3) · $226.00 proposed penalty

  10. 103 (g) Written Notification Hazard Complaint Inspectio

    inspectionRecord 6974194

    6.5 on-site hours reported

  11. Accumulation of combustible materials.

    violationRecord 9827109

    30 CFR 75.400 · $465.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 9756561

    30 CFR 75.400 · $432.00 proposed penalty

  13. Protection from falls of roof, face and ribs.

    violationRecord 9827108

    30 CFR 75.202(a) · $336.00 proposed penalty

  14. Drill dust control at underground areas of underground mines.

    violationRecord 9823395

    30 CFR 72.630(b) · $366.00 proposed penalty

  15. Communications facilities; refuge alternatives.

    violationRecord 9823394

    30 CFR 75.1600-3(a)(2) · $2,133.00 proposed penalty

  16. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 9823393

    30 CFR 75.1909(b)(2) · $226.00 proposed penalty

  17. Installation of high-voltage transmission cables.

    violationRecord 9756560

    30 CFR 75.807 · $755.00 proposed penalty

  18. Spot Inspections

    inspectionRecord 6974193

    103(i) · 9.5 on-site hours reported

  19. Protection from falls of roof, face and ribs.

    violationRecord 9827107

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty

  20. Roof control plan.

    violationRecord 9823392

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  21. Roof control plan.

    violationRecord 9823391

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  22. Roof control plan.

    violationRecord 9823390

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  23. Ventilation controls.

    violationRecord 9826594

    30 CFR 75.333(c)(2) · $226.00 proposed penalty

  24. Escapeways; bituminous and lignite mines.

    violationRecord 9826593

    30 CFR 75.380(d)(7)(vi) · $226.00 proposed penalty

  25. Accumulation of combustible materials.

    violationRecord 9826592

    30 CFR 75.400 · $432.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.