No 7 Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Short circuit protection; ratings and settings of circuit breakers.
30 CFR 75.601-1 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Surface installations; general.
30 CFR 77.200 · $245.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
30 CFR 77.502 · $2,503.00 proposed penalty
Surface installations; general.
30 CFR 77.200 · $245.00 proposed penalty
Surface installations; general.
30 CFR 77.200 · $245.00 proposed penalty
Illumination.
30 CFR 77.207 · Significant and substantial (S&S) · $5,574.00 proposed penalty
Mechanical equipment guards.
30 CFR 77.400(a) · $336.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
30 CFR 77.1606(c) · $226.00 proposed penalty
Spot Inspections
103(i) · 9.5 on-site hours reported
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $432.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
Employee was helping install tubing inby the trunk line in the #1 entry of 12 section, when EE got EE's finger caught between 2 pieces of vent tubing resulting in stitches in L Hand finger.
Map of electrical system.
30 CFR 75.508 · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $398.00 proposed penalty
Roof bolting.
30 CFR 75.204(c)(1) · $226.00 proposed penalty
Spot Inspections
103(i) · 8.0 on-site hours reported
Surface installations; general.
30 CFR 77.200 · $245.00 proposed penalty
Surface installations; general.
30 CFR 77.200 · $245.00 proposed penalty
Surface installations; general.
30 CFR 77.200 · $245.00 proposed penalty
Surface installations; general.
30 CFR 77.200 · $245.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · $151.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · Significant and substantial (S&S) · $2,133.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.