← No 7 Mine

No 7 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Accumulation of combustible materials.

    violationRecord 5063020

    30 CFR 75.400 · $432.00 proposed penalty

  2. Permissible electric face equipment; maintenance.

    violationRecord 5063019

    30 CFR 75.503 · $288.00 proposed penalty

  3. Protection of trailing cables.

    violationRecord 5063018

    30 CFR 75.606 · $755.00 proposed penalty

  4. Protection from falls of roof, face and ribs.

    violationRecord 5063017

    30 CFR 75.202(a) · $398.00 proposed penalty

  5. Electric equipment; examination, testing and maintenance.

    violationRecord 5063016

    30 CFR 75.512 · $818.00 proposed penalty

  6. Roof control plan.

    violationRecord 9822992

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  7. Power wires and cables; insulation and protection.

    violationRecord 9822991

    30 CFR 75.517 · $226.00 proposed penalty

  8. Criteria—Haulage; general.

    violationRecord 9822990

    30 CFR 75.1403-10(i)

  9. Other safeguards.

    violationRecord 5062639

    30 CFR 75.1403 · $336.00 proposed penalty

  10. Protection from falls of roof, face and ribs.

    violationRecord 5062638

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  11. Roof bolting.

    violationRecord 5062637

    30 CFR 75.204(c)(1) · $226.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 5062636

    30 CFR 75.400 · $432.00 proposed penalty

  13. Other safeguards.

    violationRecord 5062635

    30 CFR 75.1403 · $336.00 proposed penalty

  14. Condition and examination of firefighting equipment.

    violationRecord 9821743

    30 CFR 75.1100-3 · $226.00 proposed penalty

  15. Weekly examination.

    violationRecord 9821742

    30 CFR 75.364(g) · $226.00 proposed penalty

  16. Protection from falls of roof, face and ribs.

    violationRecord 5063015

    30 CFR 75.202(a) · $398.00 proposed penalty

  17. Protection of trailing cables.

    violationRecord 5063014

    30 CFR 75.606 · $755.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 5063013

    30 CFR 75.400 · $432.00 proposed penalty

  19. Protection from falls of roof, face and ribs.

    violationRecord 5063012

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  20. Spot Inspections

    inspectionRecord 6974196

    103(i) · 9.3 on-site hours reported

  21. Communications facilities; refuge alternatives.

    violationRecord 9827130

    30 CFR 75.1600-3(a)(2) · $398.00 proposed penalty

  22. Protection from falls of roof, face and ribs.

    violationRecord 9827129

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  23. Mechanical equipment guards.

    violationRecord 9827128

    30 CFR 75.1722(a) · $226.00 proposed penalty

  24. Escapeway maps.

    violationRecord 9827127

    30 CFR 75.1505(b) · $336.00 proposed penalty

  25. Methane monitors.

    violationRecord 9827126

    30 CFR 75.342(a)(4) · $226.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.