← No 7 Mine

No 7 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spot Inspections

    inspectionRecord 6974495

    103(i) · 7.0 on-site hours reported

  2. Temporary notations, revisions, and supplements.

    violationRecord 9828931

    30 CFR 75.1202-1(b)(3) · $366.00 proposed penalty

  3. Ventilation controls.

    violationRecord 9828930

    30 CFR 75.333(c) · $465.00 proposed penalty

  4. Ventilation controls.

    violationRecord 9822544

    30 CFR 75.333(c)(3) · $151.00 proposed penalty

  5. Travelways at surface installations.

    violationRecord 5069020

    30 CFR 77.205(e) · Significant and substantial (S&S) · $226.00 proposed penalty

  6. Storage of materials.

    violationRecord 5069019

    30 CFR 77.208(e) · $151.00 proposed penalty

  7. Surface installations; general.

    violationRecord 5069018

    30 CFR 77.200 · $3,184.00 proposed penalty

  8. Loading and haulage equipment; operation.

    violationRecord 5063459

    30 CFR 77.1607(bb) · $755.00 proposed penalty

  9. Travelways at surface installations.

    violationRecord 5069017

    30 CFR 77.205(b) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  10. Surface installations; general.

    violationRecord 5069016

    30 CFR 77.200 · $288.00 proposed penalty

  11. Surface installations; general.

    violationRecord 5069015

    30 CFR 77.200 · $288.00 proposed penalty

  12. Electric equipment; examination, testing, and maintenance.

    violationRecord 5069014

    30 CFR 77.502 · Significant and substantial (S&S) · $3,736.00 proposed penalty

  13. Mechanical equipment guards.

    violationRecord 5069013

    30 CFR 77.400(d) · $336.00 proposed penalty

  14. Surface installations; general.

    violationRecord 5069012

    30 CFR 77.200 · $288.00 proposed penalty

  15. Surface installations; general.

    violationRecord 5069011

    30 CFR 77.200 · $288.00 proposed penalty

  16. Surface installations; general.

    violationRecord 5069010

    30 CFR 77.200 · $288.00 proposed penalty

  17. Roof bolting.

    violationRecord 5062682

    30 CFR 75.204(c)(1) · $226.00 proposed penalty

  18. Other safeguards.

    violationRecord 5062681

    30 CFR 75.1403 · Significant and substantial (S&S) · $1,679.00 proposed penalty

  19. Accumulation of combustible materials.

    violationRecord 9822543

    30 CFR 75.400 · $432.00 proposed penalty

  20. Spot Inspections

    inspectionRecord 6975880

    103(i) · 8.0 on-site hours reported

  21. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9828929

    30 CFR 75.1731(a) · $245.00 proposed penalty

  22. Supplemental examination.

    violationRecord 9828928

    30 CFR 75.361(a)(1) · Significant and substantial (S&S) · $5,574.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 9828927

    30 CFR 75.202(a) · $398.00 proposed penalty

  24. Drill dust control at underground areas of underground mines.

    violationRecord 9828926

    30 CFR 72.630(b) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  25. Maintenance of incombustible content of rock dust.

    violationRecord 9828925

    30 CFR 75.403 · $592.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.