← No 7 Mine

No 7 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mechanical equipment guards.

    violationRecord 5069093

    30 CFR 77.400(a) · $245.00 proposed penalty

  2. Mechanical equipment guards.

    violationRecord 5069092

    30 CFR 77.400(a) · $245.00 proposed penalty

  3. Travelways at surface installations.

    violationRecord 5069091

    30 CFR 77.205(e) · $245.00 proposed penalty

  4. Ladders; construction; installation and maintenance.

    violationRecord 5069090

    30 CFR 77.206(a) · $245.00 proposed penalty

  5. Protection from falls of roof, face and ribs.

    violationRecord 5190620

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  6. Fire suppression systems for diesel-powered equipment and fuel transportation units.

    violationRecord 5190619

    30 CFR 75.1911(c) · $245.00 proposed penalty

  7. Spot Inspections

    inspectionRecord F017AD1

    103(i) · 9.0 on-site hours reported

  8. Mine ventilation plan; submission and approval.

    violationRecord 5190618

    30 CFR 75.370(a)(1) · $313.00 proposed penalty

  9. Protection from falls of roof, face and ribs.

    violationRecord 5068896

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  10. Regular Safety and Health Inspection

    inspectionRecord F017ACE

    1,118.3 on-site hours reported

  11. Spot Inspections

    inspectionRecord F017ACF

    103(i) · 8.3 on-site hours reported

  12. Verbal Hazard Complaint Inspections

    inspectionRecord F017AD0

    27.0 on-site hours reported

  13. Roof control plan.

    violationRecord 5068895

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  14. Escapeways; bituminous and lignite mines.

    violationRecord 5068894

    30 CFR 75.380(d)(7)(vi) · $366.00 proposed penalty

  15. Ventilation Technical Investigation

    inspectionRecord 6917467

    52.8 on-site hours reported

  16. Spot Inspections

    inspectionRecord F02405F

    103(i) · 5.5 on-site hours reported

  17. Maintenance of incombustible content of rock dust.

    violationRecord 9757526

    30 CFR 75.403 · $267.00 proposed penalty

  18. Spot Inspections

    inspectionRecord F017ACD

    103(i) · 5.0 on-site hours reported

  19. Maintenance of incombustible content of rock dust.

    violationRecord 5068893

    30 CFR 75.403 · $267.00 proposed penalty

  20. Storage of materials.

    violationRecord 5069089

    30 CFR 77.208(e) · $226.00 proposed penalty

  21. Violation — cited standard not reported

    violationRecord 5063547

    $233.00 proposed penalty

  22. Other safeguards.

    violationRecord 5063546

    30 CFR 75.1403 · $313.00 proposed penalty

  23. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5063545

    30 CFR 75.1909(a)(3)(iv) · $226.00 proposed penalty

  24. Spot Inspections

    inspectionRecord F017ACC

    103(i) · 9.8 on-site hours reported

  25. Power wires and cables; insulation and protection.

    violationRecord 5068892

    30 CFR 75.517 · Significant and substantial (S&S) · $3,736.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.