← No 7 Mine

No 7 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Mine ventilation plan; submission and approval.

    violationRecord 5190675

    30 CFR 75.370(a)(1) · $267.00 proposed penalty

  2. Permissible electric equipment.

    violationRecord 5190674

    30 CFR 75.500(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  3. Accumulation of combustible materials.

    violationRecord 5192223

    30 CFR 75.400 · $1,818.00 proposed penalty

  4. Spot Inspections

    inspectionRecord F024077

    103(i) · 7.0 on-site hours reported

  5. Protection from falls of roof, face and ribs.

    violationRecord 9757548

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  6. Identification of circuit breakers and disconnecting switches.

    violationRecord 5069653

    30 CFR 77.809 · $151.00 proposed penalty

  7. Fall of roof or back

    accidentRecord 220261770021

    Accident only

    Accident narrative

    A non-injury accident occurred on 1 East Belt at crosscut 16. The fall was above the anchorage bolts and measured 40' x 20' x 12'

  8. Non-Injury Accident Investigation

    inspectionRecord F024076

    19.3 on-site hours reported

  9. Violation — cited standard not reported

    violationRecord 9757547
  10. Roof control plan.

    violationRecord 5191283

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  11. Spot Inspections

    inspectionRecord F024075

    103(i) · 5.5 on-site hours reported

  12. Machinery and equipment; operation and maintenance.

    violationRecord 5191282

    30 CFR 75.1725(a) · $267.00 proposed penalty

  13. Accumulation of combustible materials.

    violationRecord 5191281

    30 CFR 75.400 · $465.00 proposed penalty

  14. Accumulation of combustible materials.

    violationRecord 5191280

    30 CFR 75.400 · $465.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 5191279

    30 CFR 75.400 · $465.00 proposed penalty

  16. Accumulation of combustible materials.

    violationRecord 5191278

    30 CFR 75.400 · $465.00 proposed penalty

  17. Maintenance of diesel-powered equipment.

    violationRecord 5192221

    30 CFR 75.1914(h)(1) · $151.00 proposed penalty

  18. Maintenance of incombustible content of rock dust.

    violationRecord 5192220

    30 CFR 75.403 · $313.00 proposed penalty

  19. Maintenance of incombustible content of rock dust.

    violationRecord 5192219

    30 CFR 75.403 · $313.00 proposed penalty

  20. Spot Inspections

    inspectionRecord F026FA9

    103(i) · 6.0 on-site hours reported

  21. Accumulation of combustible materials.

    violationRecord 5192218

    30 CFR 75.400 · $818.00 proposed penalty

  22. Accumulation of combustible materials.

    violationRecord 5191277

    30 CFR 75.400 · $465.00 proposed penalty

  23. Roof control plan.

    violationRecord 5191276

    30 CFR 75.220(a)(1) · $366.00 proposed penalty

  24. Protection from falls of roof, face and ribs.

    violationRecord 9752219

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  25. Spot Inspections

    inspectionRecord F02F31A

    103(i) · 7.8 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.