← No 7 Mine

No 7 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Travelways at surface installations.

    violationRecord 5192054

    30 CFR 77.205(a) · Significant and substantial (S&S) · $959.00 proposed penalty

  2. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5192053

    30 CFR 77.1606(c) · $193.00 proposed penalty

  3. Mine ventilation plan; submission and approval.

    violationRecord 5190682

    30 CFR 75.370(a)(1) · $288.00 proposed penalty

  4. Protection from falls of roof, face and ribs.

    violationRecord 5192227

    30 CFR 75.202(a) · $313.00 proposed penalty

  5. Accumulation of combustible materials.

    violationRecord 5192226

    30 CFR 75.400 · $366.00 proposed penalty

  6. Maintenance of incombustible content of rock dust.

    violationRecord 5191302

    30 CFR 75.403 · $151.00 proposed penalty

  7. Protection from falls of roof, face and ribs.

    violationRecord 5063829

    30 CFR 75.202(a) · $313.00 proposed penalty

  8. Escapeways; bituminous and lignite mines.

    violationRecord 5062000

    30 CFR 75.380(d)(7)(vii) · $193.00 proposed penalty

  9. Spot Inspections

    inspectionRecord F02407A

    103(i) · 7.3 on-site hours reported

  10. Protection from falls of roof, face and ribs.

    violationRecord 5191301

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  11. Travelways at surface installations.

    violationRecord 5192050

    30 CFR 77.205(e) · $288.00 proposed penalty

  12. Mechanical equipment guards.

    violationRecord 5192049

    30 CFR 77.400(d) · $288.00 proposed penalty

  13. Storage of materials.

    violationRecord 5192048

    30 CFR 77.208(d) · $193.00 proposed penalty

  14. Travelways at surface installations.

    violationRecord 5192047

    30 CFR 77.205(b) · Significant and substantial (S&S) · $959.00 proposed penalty

  15. Surface installations; general.

    violationRecord 5192046

    30 CFR 77.200 · $267.00 proposed penalty

  16. Surface installations; general.

    violationRecord 5192045

    30 CFR 77.200 · $267.00 proposed penalty

  17. Surface installations; general.

    violationRecord 5192044

    30 CFR 77.200 · $267.00 proposed penalty

  18. Mechanical equipment guards.

    violationRecord 5192043

    30 CFR 77.400(d) · $288.00 proposed penalty

  19. Ventilation controls.

    violationRecord 5191300

    30 CFR 75.333(c)(3) · $193.00 proposed penalty

  20. Impoundment Spot Inspection

    inspectionRecord F048119

    8.0 on-site hours reported

  21. Spot Inspections

    inspectionRecord 6918923

    103(i) · 6.0 on-site hours reported

  22. Roof control plan.

    violationRecord 5061999

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  23. Identification of circuit breakers and disconnecting switches.

    violationRecord 5061998

    30 CFR 75.809 · $193.00 proposed penalty

  24. Escapeways; bituminous and lignite mines.

    violationRecord 5061997

    30 CFR 75.380(d)(7)(vii)(B) · $193.00 proposed penalty

  25. Escapeways; bituminous and lignite mines.

    violationRecord 5061996

    30 CFR 75.380(d)(7)(vii) · $193.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.