← No 4 Mine

No 4 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 5193650

    30 CFR 75.1910(f) · $245.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 5193649

    30 CFR 75.400 · $465.00 proposed penalty

  3. Protection from falls of roof, face and ribs.

    violationRecord 5193648

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  4. Protection from falls of roof, face and ribs.

    violationRecord 5193647

    30 CFR 75.202(a) · $504.00 proposed penalty

  5. Spot Inspections

    inspectionRecord F03E49D

    103(i) · 6.5 on-site hours reported

  6. Criteria—Belt conveyors.

    violationRecord 5192451

    30 CFR 75.1403-5(j) · Significant and substantial (S&S) · $313.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 5191476

    30 CFR 75.400 · $465.00 proposed penalty

  8. Spot Inspections

    inspectionRecord F03E49C

    103(i) · 8.5 on-site hours reported

  9. Roof control plan.

    violationRecord 5191475

    30 CFR 75.220(a)(1) · $465.00 proposed penalty

  10. Permissible electric face equipment; maintenance.

    violationRecord 5191474

    30 CFR 75.503 · Significant and substantial (S&S) · $1,550.00 proposed penalty

  11. Roof control plan.

    violationRecord 5191473

    30 CFR 75.220(a)(1) · $465.00 proposed penalty

  12. Roof bolting.

    violationRecord 5193646

    30 CFR 75.204(c)(1) · $267.00 proposed penalty

  13. Protection from falls of roof, face and ribs.

    violationRecord 5193645

    30 CFR 75.202(a) · $504.00 proposed penalty

  14. Ventilation controls.

    violationRecord 5193644

    30 CFR 75.333(c)(3) · $245.00 proposed penalty

  15. Roof bolting.

    violationRecord 5193643

    30 CFR 75.204(c)(1) · $267.00 proposed penalty

  16. Escapeways; bituminous and lignite mines.

    violationRecord 5193642

    30 CFR 75.380(d)(7)(vi) · $245.00 proposed penalty

  17. Accumulation of combustible materials.

    violationRecord 5191472

    30 CFR 75.400 · $209.00 proposed penalty

  18. Roof control plan.

    violationRecord 5192052

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  19. Roof control plan.

    violationRecord 5192051

    30 CFR 75.220(a)(1) · $465.00 proposed penalty

  20. Ventilation controls.

    violationRecord 5190527

    30 CFR 75.333(c)(3) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  21. Ventilation controls.

    violationRecord 5190526

    30 CFR 75.333(d)(3) · $366.00 proposed penalty

  22. Protection from falls of roof, face and ribs.

    violationRecord 5190525

    30 CFR 75.202(a) · $504.00 proposed penalty

  23. Roof control plan.

    violationRecord 5191471

    30 CFR 75.220(a)(1) · $465.00 proposed penalty

  24. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5069265

    30 CFR 75.1731(a) · $267.00 proposed penalty

  25. Roof control plan.

    violationRecord 5191470

    30 CFR 75.220(a)(1) · $465.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.