← No 4 Mine

No 4 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Protection from falls of roof, face and ribs.

    violationRecord 5193659

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  2. Protection from falls of roof, face and ribs.

    violationRecord 5193658

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  3. Protection from falls of roof, face and ribs.

    violationRecord 5193657

    30 CFR 75.202(a) · $504.00 proposed penalty

  4. Ventilation controls.

    violationRecord 5193656

    30 CFR 75.333(c)(3) · $245.00 proposed penalty

  5. Protection from falls of roof, face and ribs.

    violationRecord 5193655

    30 CFR 75.202(a) · $504.00 proposed penalty

  6. Roof bolting.

    violationRecord 5193654

    30 CFR 75.204(c)(1) · $288.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 5191488

    30 CFR 75.400 · $504.00 proposed penalty

  8. Spot Inspections

    inspectionRecord F03E4A1

    103(i) · 6.0 on-site hours reported

  9. Preshift examination at fixed intervals.

    violationRecord 5191487

    30 CFR 75.360(h)

  10. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5191486

    30 CFR 75.1731(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  11. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5191485

    30 CFR 75.1731(b) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  12. Accumulation of combustible materials.

    violationRecord 5191484

    30 CFR 75.400 · Significant and substantial (S&S) · $2,503.00 proposed penalty

  13. Spot Inspections

    inspectionRecord F03E4A0

    103(i) · 9.0 on-site hours reported

  14. Protection from falls of roof, face and ribs.

    violationRecord 5191483

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  15. Accumulation of combustible materials.

    violationRecord 5191482

    30 CFR 75.400 · $465.00 proposed penalty

  16. Protection from falls of roof, face and ribs.

    violationRecord 5191481

    30 CFR 75.202(a) · $504.00 proposed penalty

  17. Ventilation controls.

    violationRecord 5191480

    30 CFR 75.333(e)(1)(ii) · $592.00 proposed penalty

  18. Protection from falls of roof, face and ribs.

    violationRecord 5063837

    30 CFR 75.202(a) · $504.00 proposed penalty

  19. Spot Inspections

    inspectionRecord F03E49F

    103(i) · 8.0 on-site hours reported

  20. Protection from falls of roof, face and ribs.

    violationRecord 5191479

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  21. Maintenance of incombustible content of rock dust.

    violationRecord 5193653

    30 CFR 75.403 · $336.00 proposed penalty

  22. Spot Inspections

    inspectionRecord F03E49E

    103(i) · 7.0 on-site hours reported

  23. Maintenance of incombustible content of rock dust.

    violationRecord 5191478

    30 CFR 75.403 · $313.00 proposed penalty

  24. Map of electrical system.

    violationRecord 5069266

    30 CFR 75.508 · $151.00 proposed penalty

  25. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5193651

    30 CFR 75.1909(a)(10) · $245.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.