← No 4 Mine

No 4 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 5062418

    30 CFR 75.1910(n) · $288.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 5062417

    30 CFR 75.400 · $592.00 proposed penalty

  3. Protection from falls of roof, face and ribs.

    violationRecord 5062416

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  4. Roof control plan.

    violationRecord 5062414

    30 CFR 75.220(a)(1) · $549.00 proposed penalty

  5. Protection from falls of roof, face and ribs.

    violationRecord 5062413

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  6. Methane monitors.

    violationRecord 9827397

    30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $1,968.00 proposed penalty

  7. Permissible electric face equipment; maintenance.

    violationRecord 9827396

    30 CFR 75.503 · Significant and substantial (S&S) · $6,037.00 proposed penalty

  8. Power wires and cables; insulation and protection.

    violationRecord 9827395

    30 CFR 75.517 · $1,037.00 proposed penalty

  9. Roof bolting.

    violationRecord 5062412

    30 CFR 75.204(c)(1) · $336.00 proposed penalty

  10. Preshift examination at fixed intervals.

    violationRecord 5062411

    30 CFR 75.360(f) · $288.00 proposed penalty

  11. Roof control plan.

    violationRecord 5062410

    30 CFR 75.220(a)(1) · $549.00 proposed penalty

  12. Roof control plan.

    violationRecord 5062409

    30 CFR 75.220(a)(1) · $549.00 proposed penalty

  13. Roof control plan.

    violationRecord 5062408

    30 CFR 75.220(a)(1) · $549.00 proposed penalty

  14. Permissible electric face equipment; maintenance.

    violationRecord 9827394

    30 CFR 75.503 · Significant and substantial (S&S) · $6,037.00 proposed penalty

  15. Spot Inspections

    inspectionRecord F025C0F

    103(i) · 2.0 on-site hours reported

  16. Power wires and cables; insulation and protection.

    violationRecord 9827393

    30 CFR 75.517 · Significant and substantial (S&S) · $5,144.00 proposed penalty

  17. Protection from falls of roof, face and ribs.

    violationRecord 9827392

    30 CFR 75.202(a) · $592.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 5061428

    30 CFR 75.400 · $642.00 proposed penalty

  19. Protection from falls of roof, face and ribs.

    violationRecord 9700489

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  20. Maintenance of diesel-powered equipment.

    violationRecord 9700488

    30 CFR 75.1914(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  21. Escapeways; bituminous and lignite mines.

    violationRecord 9700487

    30 CFR 75.380(d)(7)(i) · $288.00 proposed penalty

  22. Protection from falls of roof, face and ribs.

    violationRecord 9827391

    30 CFR 75.202(a) · $592.00 proposed penalty

  23. Machinery and equipment; operation and maintenance.

    violationRecord 9827390

    30 CFR 75.1725(a) · $504.00 proposed penalty

  24. Protection from falls of roof, face and ribs.

    violationRecord 9700486

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  25. Ventilation controls.

    violationRecord 9827389

    30 CFR 75.333(c) · $288.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.