← No 4 Mine

No 4 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Spot Inspections

    inspectionRecord F014C06

    103(i) · 11.0 on-site hours reported

  2. Inspection of fire suppression devices.

    violationRecord 5062476

    30 CFR 75.1107-16(b) · $288.00 proposed penalty

  3. Protection from falls of roof, face and ribs.

    violationRecord 5062475

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  4. Fire suppression systems for diesel-powered equipment and fuel transportation units.

    violationRecord 5062474

    30 CFR 75.1911(d) · $288.00 proposed penalty

  5. Fire suppression systems for diesel-powered equipment and fuel transportation units.

    violationRecord 5062473

    30 CFR 75.1911(a)(3) · Significant and substantial (S&S) · $1,431.00 proposed penalty

  6. Protection from falls of roof, face and ribs.

    violationRecord 5062472

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  7. Ventilation controls.

    violationRecord 9825915

    30 CFR 75.333(h) · $288.00 proposed penalty

  8. Protection from falls of roof, face and ribs.

    violationRecord 9825914

    30 CFR 75.202(a) · $592.00 proposed penalty

  9. Ventilation controls.

    violationRecord 9825913

    30 CFR 75.333(c)(3) · $288.00 proposed penalty

  10. Protection from falls of roof, face and ribs.

    violationRecord 5062471

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  11. Other safeguards.

    violationRecord 5062470

    30 CFR 75.1403 · Significant and substantial (S&S) · $1,679.00 proposed penalty

  12. Protection from falls of roof, face and ribs.

    violationRecord 5062469

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  13. Preshift examination at fixed intervals.

    violationRecord 5062468

    30 CFR 75.360(f) · $288.00 proposed penalty

  14. Accumulation of combustible materials.

    violationRecord 5062467

    30 CFR 75.400 · $549.00 proposed penalty

  15. Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.

    violationRecord 5062466

    30 CFR 75.1714-3(a) · $288.00 proposed penalty

  16. Spot Inspections

    inspectionRecord F025C10

    103(i) · 6.0 on-site hours reported

  17. Machinery and equipment; operation and maintenance.

    violationRecord 5061429

    30 CFR 75.1725(a) · $504.00 proposed penalty

  18. Nonpermissible diesel-powered equipment; electrical system design and performance requirements.

    violationRecord 5062465

    30 CFR 75.1910(f) · $288.00 proposed penalty

  19. Accumulation of combustible materials.

    violationRecord 5062464

    30 CFR 75.400 · Significant and substantial (S&S) · $2,712.00 proposed penalty

  20. Machinery and equipment; operation and maintenance.

    violationRecord 5062463

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty

  21. Protection from falls of roof, face and ribs.

    violationRecord 5062462

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  22. Spot Inspections

    inspectionRecord F014C05

    103(i) · 1.3 on-site hours reported

  23. Roof control plan.

    violationRecord 5062457

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,712.00 proposed penalty

  24. Ventilation controls.

    violationRecord 9825912

    30 CFR 75.333(c)(3) · $151.00 proposed penalty

  25. Protection from falls of roof, face and ribs.

    violationRecord 9825911

    30 CFR 75.202(a) · $592.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.