← No 4 Mine

No 4 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Mechanical equipment guards.

    violationRecord 5192092

    30 CFR 77.400(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  2. Mechanical equipment guards.

    violationRecord 5192091

    30 CFR 77.400(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  3. Travelways at surface installations.

    violationRecord 5192090

    30 CFR 77.205(b) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  4. Surface installations; general.

    violationRecord 5192089

    30 CFR 77.200 · $818.00 proposed penalty

  5. Surface installations; general.

    violationRecord 5192088

    30 CFR 77.200 · $818.00 proposed penalty

  6. Identification of circuit breakers.

    violationRecord 5192087

    30 CFR 77.904 · Significant and substantial (S&S) · $1,219.00 proposed penalty

  7. Surface installations; general.

    violationRecord 5192086

    30 CFR 77.200 · $245.00 proposed penalty

  8. Surface installations; general.

    violationRecord 5192085

    30 CFR 77.200 · $245.00 proposed penalty

  9. Loading and haulage equipment; operation.

    violationRecord 5192084

    30 CFR 77.1607(cc) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  10. Identification of circuit breakers.

    violationRecord 5190971

    30 CFR 77.904 · Significant and substantial (S&S) · $1,818.00 proposed penalty

  11. Travelways at surface installations.

    violationRecord 5190970

    30 CFR 77.205(b) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  12. Travelways at surface installations.

    violationRecord 5190969

    30 CFR 77.205(e) · $245.00 proposed penalty

  13. Mechanical equipment guards.

    violationRecord 5190968

    30 CFR 77.400(a) · $366.00 proposed penalty

  14. Surface installations; general.

    violationRecord 5190967

    30 CFR 77.200 · $245.00 proposed penalty

  15. Spot Inspections

    inspectionRecord F03E4A4

    103(i) · 6.5 on-site hours reported

  16. Escapeways; bituminous and lignite mines.

    violationRecord 5191490

    30 CFR 75.380(d)(1) · $1,968.00 proposed penalty

  17. Spot Inspections

    inspectionRecord F03E4A3

    103(i) · 7.5 on-site hours reported

  18. Ventilation controls.

    violationRecord 5191489

    30 CFR 75.333(h) · $755.00 proposed penalty

  19. Storage of materials.

    violationRecord 5192083

    30 CFR 77.208(d) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  20. Surface installations; general.

    violationRecord 5192082

    30 CFR 77.200 · $366.00 proposed penalty

  21. Electric equipment; examination, testing, and maintenance.

    violationRecord 5192081

    30 CFR 77.502 · $818.00 proposed penalty

  22. Travelways at surface installations.

    violationRecord 5190961

    30 CFR 77.205(a) · $245.00 proposed penalty

  23. Surface installations; general.

    violationRecord 5190960

    30 CFR 77.200 · $245.00 proposed penalty

  24. Mechanical equipment guards.

    violationRecord 5190959

    30 CFR 77.400(d) · $366.00 proposed penalty

  25. Drill dust control at underground areas of underground mines.

    violationRecord 5190698

    30 CFR 72.630(b) · Significant and substantial (S&S) · $1,968.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.