← No 4 Mine

No 4 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Preshift examination at fixed intervals.

    violationRecord 5191212

    30 CFR 75.360(g) · $245.00 proposed penalty

  2. Protection from falls of roof, face and ribs.

    violationRecord 5191211

    30 CFR 75.202(a) · $465.00 proposed penalty

  3. Escapeway maps.

    violationRecord 5062746

    30 CFR 75.1505(b) · $245.00 proposed penalty

  4. Protection from falls of roof, face and ribs.

    violationRecord 5062745

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  5. Spot Inspections

    inspectionRecord F01A736

    103(i) · 1.5 on-site hours reported

  6. Emergency Response Plan; refuge alternatives.

    violationRecord 5190460

    30 CFR 75.1507(a)(9) · $366.00 proposed penalty

  7. Ventilation controls.

    violationRecord 5191210

    30 CFR 75.333(c)(3) · $245.00 proposed penalty

  8. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5191209

    30 CFR 75.1731(a) · $245.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 5191203

    30 CFR 75.400 · $432.00 proposed penalty

  10. Grounding metallic frames, casings, and other enclosures of electric equipment.

    violationRecord 9828992

    30 CFR 75.701 · $245.00 proposed penalty

  11. Short circuit protection of trailing cables.

    violationRecord 9828991

    30 CFR 75.601 · $366.00 proposed penalty

  12. Power centers.

    violationRecord 9828990

    30 CFR 75.825(d) · $245.00 proposed penalty

  13. Verbal Hazard Complaint Inspections

    inspectionRecord F01A735

    3.0 on-site hours reported

  14. Roof Control Technical Investigation

    inspectionRecord 6920868

    42.5 on-site hours reported

  15. Preshift examination at fixed intervals.

    violationRecord 9828989

    30 CFR 75.360(b) · $2,712.00 proposed penalty

  16. Mine ventilation plan; submission and approval.

    violationRecord 9828988

    30 CFR 75.370(a)(1) · $2,936.00 proposed penalty

  17. Spot Inspections

    inspectionRecord F02E139

    103(i) · 5.5 on-site hours reported

  18. Regular Safety and Health Inspection

    inspectionRecord F01A734

    680.3 on-site hours reported

  19. Spot Inspections

    inspectionRecord F014C1D

    103(i) · 4.0 on-site hours reported

  20. Spot Inspections

    inspectionRecord F025C2F

    103(i) · 5.3 on-site hours reported

  21. Spot Inspections

    inspectionRecord F025C2E

    103(i) · 4.8 on-site hours reported

  22. Nonpermissible diesel-powered equipment; design and performance requirements.

    violationRecord 5190098

    30 CFR 75.1909(a)(3)(x) · $226.00 proposed penalty

  23. Power wires and cables; insulation and protection.

    violationRecord 5190097

    30 CFR 75.517 · Significant and substantial (S&S) · $1,126.00 proposed penalty

  24. Protection from falls of roof, face and ribs.

    violationRecord 5190096

    30 CFR 75.202(a) · $432.00 proposed penalty

  25. Roof control plan.

    violationRecord 5190095

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,133.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.