← No 4 Mine

No 4 Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Impoundment Spot Inspection

    inspectionRecord F0395C0

    6.0 on-site hours reported

  2. Other safeguards.

    violationRecord 5191230

    30 CFR 75.1403 · Significant and substantial (S&S) · $1,550.00 proposed penalty

  3. Accumulation of combustible materials.

    violationRecord 5191229

    30 CFR 75.400 · $465.00 proposed penalty

  4. Spot Inspections

    inspectionRecord F01A73D

    103(i) · 7.0 on-site hours reported

  5. Mine ventilation plan; submission and approval.

    violationRecord 5191409

    30 CFR 75.370(a)(1) · $313.00 proposed penalty

  6. Mine ventilation plan; submission and approval.

    violationRecord 5191408

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $5,144.00 proposed penalty

  7. Protection from falls of roof, face and ribs.

    violationRecord 5190472

    30 CFR 75.202(a) · $504.00 proposed penalty

  8. Preshift examination at fixed intervals.

    violationRecord 5190471

    30 CFR 75.360(g) · $151.00 proposed penalty

  9. Protection from falls of roof, face and ribs.

    violationRecord 5191407

    30 CFR 75.202(a) · $504.00 proposed penalty

  10. Accumulation of combustible materials.

    violationRecord 5191406

    30 CFR 75.400 · $465.00 proposed penalty

  11. Accumulation of combustible materials.

    violationRecord 5191405

    30 CFR 75.400 · $1,126.00 proposed penalty

  12. Dust accumulations in surface installations.

    violationRecord 5191226

    30 CFR 77.202 · $245.00 proposed penalty

  13. Dust accumulations in surface installations.

    violationRecord 5191225

    30 CFR 77.202 · $245.00 proposed penalty

  14. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5191224

    30 CFR 77.1606(c) · $366.00 proposed penalty

  15. Protection from falls of roof, face and ribs.

    violationRecord 5063818

    30 CFR 75.202(a) · $504.00 proposed penalty

  16. Spot Inspections

    inspectionRecord F01A73C

    103(i) · 6.3 on-site hours reported

  17. Roof control plan.

    violationRecord 5190468

    30 CFR 75.220(a)(1) · $465.00 proposed penalty

  18. Escapeways; bituminous and lignite mines.

    violationRecord 5191404

    30 CFR 75.380(d)(7)(iv) · Significant and substantial (S&S) · $9,757.00 proposed penalty

  19. Spot Inspections

    inspectionRecord F01A73B

    103(i) · 7.5 on-site hours reported

  20. Protection from falls of roof, face and ribs.

    violationRecord 5191403

    30 CFR 75.202(a) · Significant and substantial (S&S) · $2,312.00 proposed penalty

  21. Accumulation of combustible materials.

    violationRecord 5191402

    30 CFR 75.400 · $1,037.00 proposed penalty

  22. Preshift examination at fixed intervals.

    violationRecord 5191223

    30 CFR 75.360(g) · $151.00 proposed penalty

  23. Protection from falls of roof, face and ribs.

    violationRecord 5191222

    30 CFR 75.202(a) · Significant and substantial (S&S) · $3,448.00 proposed penalty

  24. Spot Inspections

    inspectionRecord F01A73A

    103(i) · 6.0 on-site hours reported

  25. Protection from falls of roof, face and ribs.

    violationRecord 5190467

    30 CFR 75.202(a) · $465.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.